c)protective covering of exposed areas that be undertaken between the hours nominated in
are left for more than 2 S4.2.
weeks; and
d) if there is no valid development permit for the
site, disturbed areas are revegetated using
species identified in PSP3 - Landscaping
Plants and Guidelines;
AND
S4.2 Earthworks are undertaken only during the
hours of 7am to 6pm, Monday to Friday and 7am
to 6pm on Saturday. No work is undertaken on
Sunday or public holidays.
Vegetative Waste S5.1 Cleared vegetation is transported off- site RO5 Any vegetative waste encountered will be
O5 for disposal in an approved green waste transported to an approved green waste
Vegetation cleared from a development site is disposal facility; disposal facility, mulched on-site for internal
disposed of in an environmentally responsible manner. OR landscaping, or disposed of for the purpose of
S5.2 Cleared vegetation is mulched on-site and firewood.
reused for landscaping of the finished
development;
OR
S5.3 Cleared vegetation is disposed of for the
purpose of firewood. (Note: Disposal of
vegetative waste by burning off is not an
acceptable method of disposal).
Managing contamination risk S6.1 The fill material is solid clean earth, free of RO6 Based on preliminary earthworks calculations
O6 putrescible or refuse material, vegetation, acid there will be more cut than fill therefore it is
Materials used as fill are suitable for development of sulfate soils, building or construction material or intended to use the existing site material. All
the land and filling or excavation works do not result in other material or contaminants; imported fill, if required, will only be clean. This
the contamination of land. AND requirement will be defined within the
S6.2 The site is not on the contaminated land construction documentation.
register.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.