Appendix D_Engineering Report

Attached to the e-mail MCU15/0109 IDAS Forms, Planning Report & Engineering Report - Links Drive Noosa Heads.

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 25, section 1. The text section number identifies this passage in the reader.

                                                          c)protective covering of exposed areas that                be undertaken between the hours nominated in
                                                          are left for more than 2                                   S4.2.
                                                          weeks; and
                                                          d) if there is no valid development permit for the
                                                          site, disturbed areas are revegetated using
                                                          species identified in PSP3 - Landscaping
                                                          Plants and Guidelines;
                                                          AND
                                                          S4.2 Earthworks are undertaken only during the
                                                          hours of 7am to 6pm, Monday to Friday and 7am
                                                          to 6pm on Saturday. No work is undertaken on
                                                          Sunday or public holidays.
Vegetative Waste                                      S5.1 Cleared vegetation is transported off- site RO5 Any vegetative waste encountered will be
O5                                                    for disposal in an approved green waste             transported to an approved green waste
Vegetation cleared from a development site is disposal facility;                                          disposal facility, mulched on-site for internal
disposed of in an environmentally responsible manner. OR                                                  landscaping, or disposed of for the purpose of
                                                      S5.2 Cleared vegetation is mulched on-site and      firewood.
                                                      reused for landscaping of the finished
                                                      development;
                                                      OR
                                                      S5.3 Cleared vegetation is disposed of for the
                                                      purpose of firewood. (Note: Disposal of
                                                      vegetative waste by burning off is not an
                                                      acceptable method of disposal).
Managing contamination risk                               S6.1 The fill material is solid clean earth, free of RO6 Based on preliminary earthworks calculations
O6                                                        putrescible or refuse material, vegetation, acid         there will be more cut than fill therefore it is
Materials used as fill are suitable for development of sulfate soils, building or construction material or         intended to use the existing site material. All
the land and filling or excavation works do not result in other material or contaminants;                          imported fill, if required, will only be clean. This
the contamination of land.                                AND                                                      requirement will be defined within the
                                                          S6.2 The site is not on the contaminated land            construction documentation.
                                                          register.
Log in to download the original file

Appendix D_Engineering Report.pdf · 10.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.