Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Appendix D_Engineering Report

Attached to the e-mail MCU15/0109 IDAS Forms, Planning Report & Engineering Report - Links Drive Noosa Heads.

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 33, section 1. The text section number identifies this passage in the reader.

S17.6 Appropriate width of road and verge is         RO17.6 Not applicable.
provided to allow streets to perform their
designated functions in the street network;
AND
S17.7 A network of local streets focused             RO17.7 Refer Traffic Consultant advice.
towards an activity centre or school is provided
for safe and efficient pedestrian and bike access
to the school, safe conditions for school buses,
setdown facilities, with on-site parking where
practical;
AND
S17.8 Passive surveillance is maximised by           RO17.8 Not applicable.
designing streets to enable development to front
all streets and roads, including arterials;
AND
S17.9 Streets near Public Passenger Transport        RO17.9 Acknowledged.
facilities are orientated to optimise the walkable
catchments within 800 metres walking distance;
AND
S17.10 The street network has no more than 15        RO17.10 Not applicable.
percent of lots fronting cul-de-sacs. The
maximum cul-de-sac length is 120 m;
AND
S17.11 Street stubs to adjacent future               RO17.11 Acknowledged. Access will be provided for
development areas are provided at spacings of                future connection to the adjacent Precinct
200m or closer to enable future street                       F located north of the site.
connections to be made;
AND
S17.12 Street block lengths are not more than        RO17.12 Acknowledged.
240m long, and predominantly around 150-
180m long. Street block lengths are generally
shorter closer to town and neighbourhood
centres;
AND
S17.13 Direct, safe and attractive pedestrian        RO17.13 Acknowledged.
and cycle routes are provided within and
through the development and connect to bus
stops.
Log in to download the original file

Appendix D_Engineering Report.pdf · 10.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.