Original source · versioned page text
Appendix D_Engineering Report
Attached to the e-mail MCU15/0109 IDAS Forms, Planning Report & Engineering Report - Links Drive Noosa Heads.
The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 43, section 1. The text section number identifies this passage in the reader.
Water Sensitive Design Code – The Noosa Plan
Performance Criteria and Acceptable Solutions
Water reuse S1.1 Development complies with the water RO1.1 Refer to the Engineering Services
O1 quality standards in Table 2 of the SEQ Regional Assessment prepared by Morgan
Development uses a combination of detention and Plan Implementation Guideline No. Consulting Engineers.
retention systems to capture run-off from areas on the 7 for Water Sensitive Urban Design;
site;
AND
O2
Water storage devices must have sufficient capacity S2.1 No solution provided RO2.1 Refer to the Engineering Services
having regard to local rainfall pattern and the Assessment prepared by Morgan
catchment area of roof or other hard standing surface Consulting Engineers.
AND
O3 S3.1 Captured water is plumbed to be available RO3.1 Refer to the Engineering Services
Captured water is utilised for all non-potable uses on for all external uses including gardening, Assessment prepared by Morgan
site; irrigation, ponds, filling swimming pools and Consulting Engineers.
AND outdoor cleaning, as well as all ground floor toilet
cisterns and washing machine cold taps;
AND
S3.2 W here the captured water is used for toilet RO3.2 Refer to the Engineering Services
flushing and/or laundry use, an automatic or Assessment prepared by Morgan
manual interchange device that allows alternate Consulting Engineers.
use of captured water or the reticulated water
supply is installed to ensure that there is a
continual supply of water for sanitary flushing
and laundry use.
O4
On-site detention does not adversely impact on water S4.1 No solution provided RO4.1 Refer to the Engineering Services
requirements downstream of the site where the water Assessment prepared by Morgan
is required to sustain the ecology and hydrology of Consulting Engineers.
downstream systems (environmental flows);
AND
O5
Within the Shire Business Centre site, as shown on S5.1 No solution provided RO5.1 Refer to the Engineering Services
Map SBC, on-site detention measures are contained Assessment prepared by Morgan
Consulting Engineers.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.