Original source · versioned page text
Appendix D_Engineering Report
Attached to the e-mail MCU15/0109 IDAS Forms, Planning Report & Engineering Report - Links Drive Noosa Heads.
The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 44, section 1. The text section number identifies this passage in the reader.
within the developed areas of the site, clear of drainage lines and Open Space Precincts.; Run-off treatment S6.1 & S7.1 Development complies with the RO6.1/7.1 Refer to the Engineering Services O6 water quality standards in Table 2 of the SEQ Assessment prepared by Morgan Run-off that leaves the site is treated so as Regional Plan Implementation Guideline No. 7 Consulting Engineers. not to adversely impact on the ecology and for Water Sensitive Urban Design. hydrology of downstream environmental flows; AND O7 Within the Shire Business Centre site, as shown on Map SBC— a) run-off treatment occurs within the site ; and b) drainage lines are only used for final polishing of run-off. Town water supply connections S8.1 A suitable backflow prevention device is RO8.1 Not Applicable. O8 installed to protect the potable water within the Backflow devices or similar systems ensure water reticulated water supply in accordance with reuse facilities have no impact on the quality of the AS/NZS 3500:2003 Plumbing and Drainage. town mains water. Use of natural treatments and systems Use of natural treatments and systems RO9 Refer to the Engineering Services Assessment O9 O9 prepared by Morgan Consulting Engineers. Natural treatment strategies, including grass swales Natural treatment strategies, including grass and bio-retention systems, vegetated filtration strips swales and bio-retention systems, vegetated and gross pollutant traps, are used wherever filtration strips and gross pollutant traps, are used practicable; wherever practicable; AND AND O10 O10 RO10 Refer to the Engineering Services Within the Shire Business Centre, as shown on Map Within the Shire Business Centre, as shown on Assessment prepared by Morgan SBC— where necessary, drainage lines are Map SBC— where necessary, drainage lines are Consulting Engineers. ecologically enhanced to ensure that the water quality ecologically enhanced to ensure that the water polishing functions are of high standard. quality polishing functions are of high standard.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.