Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Appendix D_Engineering Report

Attached to the e-mail MCU15/0109 IDAS Forms, Planning Report & Engineering Report - Links Drive Noosa Heads.

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 44, section 1. The text section number identifies this passage in the reader.

within the developed areas of the site, clear of drainage
lines and Open Space Precincts.;



Run-off treatment                                      S6.1 & S7.1 Development complies with the RO6.1/7.1 Refer to the Engineering Services
O6                                                     water quality standards in Table 2 of the SEQ       Assessment prepared by Morgan
Run-off that leaves the site is treated so as          Regional Plan Implementation Guideline No. 7        Consulting Engineers.
not to adversely impact on the ecology and             for Water Sensitive Urban Design.
hydrology of downstream environmental flows;
AND
O7
Within the Shire Business Centre site, as shown
on Map SBC—
a) run-off treatment occurs within the site ; and
b) drainage lines are only used for final polishing of
run-off.
Town water supply connections                         S8.1 A suitable backflow prevention device is       RO8.1 Not Applicable.
O8                                                    installed to protect the potable water within the
Backflow devices or similar systems ensure water reticulated water supply in accordance with
reuse facilities have no impact on the quality of the AS/NZS 3500:2003 Plumbing and Drainage.
town mains water.


Use of natural treatments and systems                  Use of natural treatments and systems             RO9 Refer to the Engineering Services Assessment
O9                                                     O9                                                    prepared by Morgan Consulting Engineers.
Natural treatment strategies, including grass swales Natural treatment strategies, including grass
and bio-retention systems, vegetated filtration strips swales and bio-retention systems, vegetated
and gross pollutant traps, are used wherever filtration strips and gross pollutant traps, are used
practicable;                                           wherever practicable;
AND                                                    AND
O10                                                    O10                                               RO10 Refer to the Engineering Services
Within the Shire Business Centre, as shown on Map Within the Shire Business Centre, as shown on                 Assessment      prepared     by    Morgan
SBC— where necessary, drainage lines are Map SBC— where necessary, drainage lines are                           Consulting Engineers.
ecologically enhanced to ensure that the water quality ecologically enhanced to ensure that the water
polishing functions are of high standard.              quality polishing functions are of high standard.
Log in to download the original file

Appendix D_Engineering Report.pdf · 10.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.