Original source · versioned page text
Rpt-Proposed Lots 17 - 19, 28 Eenie Creek Rd, Noosaville_FINAL_
Attached to the e-mail Email with amended da form and planning report.msg.
Assessment Team Comments Applicant Response
reasonable to provide some car parking for visitors at The development proposes additional car spaces to
a rate of 1 space per 4 dwelling units. what is prescribed in the Acceptable Outcome. An
additional 27 resident spaces are proposed. In
addition, 8 visitor car parking spaces are required.
The proposed car parking spaces are considered
sufficient to cater for the expected parking demand for
the development. Further details are provided in
Section 8.5 and in the Traffic Engineering Report
prepared by TTM (Appendix K).
Traffic, Access and Servicing
Council required further detail around vehicles A Traffic Impact Assessment has been prepared by
entering and exiting the site, this includes both private TTM and included as Appendix K to this report. The
vehicles as well as heavy vehicles which are traffic reporting, concludes the following:
proposed to service the site. Council require the
submission of vehicle and swept paths to support the • Vehicle access and egress is proposed via a
proposal. 6.2m wide Type B driveway crossover to
Hofmann Drive;
A traffic report prepared by a suitably qualified person • Swept Paths have been incorporated to the traffic
is required. engineering reporting, demonstrating that
appropriate servicing and the abovementioned
vehicle can appropriately service the site and exit
in a forward gear;
• The proposed service vehicle arrangements are
considered adequate to meet the demands of the
proposed development.
Please refer to Appendix K for the full traffic report
prepared by TTM.
Stormwater Quality and Management
Stormwater collection and treatment has to been Stormwater quantity and quality is proposed to be
indicated the proposed plans. Any application will managed on-site via on-site detention / bio-retention
require the submission of site specific stormwater basins and grassed swale drains (as a supplementary
management plan prepared by a RPEQ method to improve water quality across the site).
demonstrating a functional stormwater system can be
provided which achieves the desired outcomes for The proposed primary lawful point of discharge for the
both water quality and quantity. development is to the open drainage channel
(Covenant J) to the east of the site, in accordance
with the requirements of the existing ROL Permit
(Court Order: 765 of 2020). A small portion of the
development catchment will discharge to the kerb and
channel in Hofmann Drive, which in turn discharges
via gully pits to the eastern drainage channel adjacent
to the east of the site.
All of the on-site stormwater management systems
have been clearly identified on the proposed plans.
Please refer to Appendix J providing a copy of the
Proposed Architectural Plans prepared by Mode
Design.
Additionally, a Site Based Stormwater Management
Plan (‘SBSMP’) has been prepared by ADG
Engineers and provided within Appendix J to this
report. The SBSMP concludes that the proposed
development achieves all of the relevant Stormwater
quantity and quality objectives outlined in the relevant
policies and standards.
URBIS
RPT-PROPOSED LOTS 17 - 19, 28 EENIE CREEK RD, NOOSAVILLE_FINAL PRE-LODGEMENT DISCUSSIONS 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.