Council archive · source document
09/1227 - Response to Information Request [As Published] · 142009.1227
FAIRSHORE APARTMENTS REFURBISHMENT • Notes for Landscape Masterplan Planting S^eclfications Refer to Drawing No WD 103 T3 Soil Preparation Retain all 5 mature Palms and 12 Pandanus to Main Beach frontage Refer to Tree Protection Plan to ensure damage is minimised during external works Retain all mature Palms in the two raised planter beds to Hastings Street car park entry Remove all unwanted plants, debris, rubbish, grass, etc from areas to be planted, including root balls of removed plants Break up soil as necessary to provide friable planting medium, taking care around existing trees Incorporate composted organic material into soil in all planting areas at rate of 1 m3 per 20 m2 Form garden beds & spread any stockpiled topsoil Beds adjacent to hard areas to finish 100mm below paved level to allow for depth of mulch Any imported topsoil and compost to be free of large stones, weeds, sticks, rubbish, or any material toxic to plant growth & shall be guaranteed free of Nut Grass & Oxalis Plants Plants to be ordered in advance from reputable sources to ensure availability Substitute species and container sizes are to be approved by Landscape Architect Plants to be well-formed, hardened-off stock, well-branched & foliated, true to type Root system to be sturdily established in container with no large roots extending Form & habit to be normal for species scheduled & pruning scars to be clean cut Leaves to be of normal shape, colour & texture with minimal physical damage Plants to be free of living insect pests and free from any disease or physical injury Containers are to be free of weeds All plants to be delivered to site clearly & accurately labelled Contractor shall maintain plants on site until planted Keep existing container plants indicated for re-use well maintained during the construction period prior to transplanting into new containers as specified Dead or damaged plants to be replaced at contractor's expense Planting Procedures Do not plant in extreme hot, cold or atmospheric disturbances Dig separate holes for each plant, 100mm wider & deeper than container Loosen soil at base of holes a further 150mm depth Fill holes with water & allow to drain away Position plant in centre of hole, set plumb & backfill, incorporating controlled release fertiliser as instructed on packaging Gently & firmly tamp down around root ball, leaving a shallow watering depression Water immediately and thoroughly using minimum 5 litres per plant Irrigation New automatic irrigation system with rain sensors to be installed to all garden beds, turfed areas and planted containers by qualified contractor using best practices and materials Ensure conduits are installed under paved areas to enable watering of isolated areas Existing irrigation system to podium areas to be rerouted to suit new positions of containers Irrigation lines between containers are to be concealed as much as possible Connect irrigation system to new rainwater tanks Mulching All garden areas are to be mulched after planting and installation of irrigation Rock mulch to outdoor shower to be 40mm Tumbled Sandstone rock spread 100mm minimum depth Existing rock mulch to Hastings Street podium area to be replaced with 40mm Tumbled Sandstone spread 50- 75mm deep after placement of containers All other garden areas to have 100mm minimum depth of 25-30mm Cypress or Hardwood chip mulch as selected Mulch to be kept at least 50mm from all plant stems to prevent collar rot Turfing Grass species to be 'Sea Isle 2000' Keep all turfs moist Turf to be first quality (A Grade), typical of the species, free from all pests, diseases & other deleterious matter Turf to be guaranteed free from Oxalis and Nut Grass Ensure existing turf and roots are completely removed before re-turfing Cultivate soil over areas to be turfed to a minimum depth of 150mm, rake over to remove clods & debris Grade all areas evenly prior to laying Top of turf is to finish 40mm below adjacent kerbs, paths and edgings Turf to be laid by supplier, using best practices and materials Water the whole of the area thoroughly but lightly after completion of turfing & top dressing Winter & Co Pty Ltd I
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1227 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.