Establishment
The Contractor shall establish and maintain the landscaping works until the end of the Defects Liability Period
Make good any defects due to infenor materials, workmanship or damage dung construction and maintenance.
Carry out all necessary watering, weeding, pruning & plant replacements to ensure healthy growth
Replace any dead or damaged plants with same species and similar size at the contractor's expense (except for
vandalism)
Remove all debris and leave site in a clean and tidy manner

Containers
Order specified type, number and colours of containers from suppliers at least 5 weeks in advance to ensure
availability
Type A, D & E supplier is the Container Connection Contact Trevor Murphy on 07-37120466 or
gId containerconnection corn au Factory closes between and December and mid January
Ensure drainage holes are provided to base of all containers, above water reservoir where applicable
Provide growing medium to containers as follows
Type A & C -100mm layer of Hydrocell Flake in base with High Podium Potting Mix (40% Hydrocell, 50% washed
sand, 10% organic) to remainder
Type D - 300-400mm layer rock (reuse existing podium rock if possible) in base covered with layer of Geofabnc,
then 100mm Hydrocell Flake and High Podium Potting Mix to remainder
Type E - 100mm layer of Hydrocell Flake in base with Organic Potting Mix (70% composted fine bark based
product with soil conditioner, 30% Hydrocell) to remainder
Incorporate slow release fertiliser suitable for containers as instructed on packaging
Soil level to finish 100mm below top of container
Provide 75mm minimum depth of 25-30mm Cypress or Hardwood chip mulch as selected
Ensure containers are kept moist at all times until end of the Defects Liability Period
Fairshore Apartments Maintenance Contractors to continue watering regime, ensure correct operation of irrigation
system and reapply controlled release fertiliser twice yearly in late Winter and early Summer to ensure continued
plant health




f lard: Lanascat ii`3      Bilge ficat9on S

Rock Wall
Refer to Detail
Wail to be constructed from hand selected150-400mm grade Envirostone rock
Footing to be 250mmD x 500mmW, with 1 layer 4 bar F11 trench mesh
Budd wall in random rubble properly bonded with smooth faces exposed and outer face vertical
Bed & point in mortar keeping minimal variation in joint thickness
Top of wall to finish a minimum width of 300mm and to the heights above level of path as shown on detail
Clean off mortar droppings as they occur On completion clean down all rockwork and adjoining surfaces where
necessary
Remove all debris, surplus materials, etc from the site and leave in a clean and tidy state

Outdoor Shower
Refer to Detail
Decking to be 120 x 30 select grade lronbark, durability class 1, with 5mm gaps fixed to joists with stainless steel
screws
Frames to be constructed from 75 x 50 Ironbark joists at 500mm maximum centres
Fixed walkway sections to be supported on stainless steel fish plates, 50 x 6 x 600mm long, set into mass
concrete footings at Im maximum centres along both sides Joists to clear finished levels 100mm
Shower decking to be constructed in 3 sections over concrete base as per detail to allow clearing of sand trap by
lifting removable middle section
90 mm PVC stormwater pipe to connect into existing shower drain fine

Bush Rocks
Bush rocks to range from 400 to 600mm diameter and have a weathered appearance
Boulders shall be positioned as per drawings and shall be placed to assume a natural relationship with each other
and the surrounding garden area by burying about a third below ground
Use boulders to advantage to stabilise slopes and separate different mulch types

Garden Edging
Garden edging between garden beds and turfed areas to be continuous extruded natural concrete, 100mmW x
100mmD, with tooled joints at 1500mm maximum centres
Between boundary and boardwalk external to property use hardwood sleepers on edge between garden beds and
turfed areas to match existing

Paving
Tile pavers through grassed areas to match podium ties as specified In External Finishes Schedule
Pavers to be laid on concrete pads with top surfaces evenly level at height to suit adjoining tiled areas and with
approx 180mm gaps between tiles
Turfs to be cut to suit gaps and laid to best practices as for remainder of grassed areas

Amended 17/11/09



Winter & Co Ply Ltd                                                                                                    2

Used in these records

About this file

File size
3.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1227 - Response to Information Request [As Published].pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.