Council archive · source document
09/1227 - Response to Information Request [As Published] · 142009.1227
Establishment The Contractor shall establish and maintain the landscaping works until the end of the Defects Liability Period Make good any defects due to infenor materials, workmanship or damage dung construction and maintenance. Carry out all necessary watering, weeding, pruning & plant replacements to ensure healthy growth Replace any dead or damaged plants with same species and similar size at the contractor's expense (except for vandalism) Remove all debris and leave site in a clean and tidy manner Containers Order specified type, number and colours of containers from suppliers at least 5 weeks in advance to ensure availability Type A, D & E supplier is the Container Connection Contact Trevor Murphy on 07-37120466 or gId containerconnection corn au Factory closes between and December and mid January Ensure drainage holes are provided to base of all containers, above water reservoir where applicable Provide growing medium to containers as follows Type A & C -100mm layer of Hydrocell Flake in base with High Podium Potting Mix (40% Hydrocell, 50% washed sand, 10% organic) to remainder Type D - 300-400mm layer rock (reuse existing podium rock if possible) in base covered with layer of Geofabnc, then 100mm Hydrocell Flake and High Podium Potting Mix to remainder Type E - 100mm layer of Hydrocell Flake in base with Organic Potting Mix (70% composted fine bark based product with soil conditioner, 30% Hydrocell) to remainder Incorporate slow release fertiliser suitable for containers as instructed on packaging Soil level to finish 100mm below top of container Provide 75mm minimum depth of 25-30mm Cypress or Hardwood chip mulch as selected Ensure containers are kept moist at all times until end of the Defects Liability Period Fairshore Apartments Maintenance Contractors to continue watering regime, ensure correct operation of irrigation system and reapply controlled release fertiliser twice yearly in late Winter and early Summer to ensure continued plant health f lard: Lanascat ii`3 Bilge ficat9on S Rock Wall Refer to Detail Wail to be constructed from hand selected150-400mm grade Envirostone rock Footing to be 250mmD x 500mmW, with 1 layer 4 bar F11 trench mesh Budd wall in random rubble properly bonded with smooth faces exposed and outer face vertical Bed & point in mortar keeping minimal variation in joint thickness Top of wall to finish a minimum width of 300mm and to the heights above level of path as shown on detail Clean off mortar droppings as they occur On completion clean down all rockwork and adjoining surfaces where necessary Remove all debris, surplus materials, etc from the site and leave in a clean and tidy state Outdoor Shower Refer to Detail Decking to be 120 x 30 select grade lronbark, durability class 1, with 5mm gaps fixed to joists with stainless steel screws Frames to be constructed from 75 x 50 Ironbark joists at 500mm maximum centres Fixed walkway sections to be supported on stainless steel fish plates, 50 x 6 x 600mm long, set into mass concrete footings at Im maximum centres along both sides Joists to clear finished levels 100mm Shower decking to be constructed in 3 sections over concrete base as per detail to allow clearing of sand trap by lifting removable middle section 90 mm PVC stormwater pipe to connect into existing shower drain fine Bush Rocks Bush rocks to range from 400 to 600mm diameter and have a weathered appearance Boulders shall be positioned as per drawings and shall be placed to assume a natural relationship with each other and the surrounding garden area by burying about a third below ground Use boulders to advantage to stabilise slopes and separate different mulch types Garden Edging Garden edging between garden beds and turfed areas to be continuous extruded natural concrete, 100mmW x 100mmD, with tooled joints at 1500mm maximum centres Between boundary and boardwalk external to property use hardwood sleepers on edge between garden beds and turfed areas to match existing Paving Tile pavers through grassed areas to match podium ties as specified In External Finishes Schedule Pavers to be laid on concrete pads with top surfaces evenly level at height to suit adjoining tiled areas and with approx 180mm gaps between tiles Turfs to be cut to suit gaps and laid to best practices as for remainder of grassed areas Amended 17/11/09 Winter & Co Ply Ltd 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1227 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.