18.   A bikeway/footpath 1.5 metres wide shall be constructed across the full frontage of the development. The
      footpath shall have a slip resistant surface. The alignment, of which, shall be determined on site with
      Council’s Construction Technical Officer. The expansion joints in any bikeway/footpath shall be “sawcut”
      not trowel jointed.
      Alternatively in lieu of the construction of the footpath the applicant shall make a contribution of $1,276
      towards the construction of footpaths in the Weyba Street local area. This amount will be subject to
      variations in the Consumer Price Index, All Groups Brisbane from June 2007 until the date of payment.
      The contribution shall be paid to Council prior to the release of any bond monies previously paid in
      accordance with the conditions of Development Permit No. 2006/138.
19.   To ensure Council’s sewer main is accessible for maintenance purposes and is protected from risk of
      damage no structures requiring a building permit (eg. buildings, swimming pools, dividing walls exceeding
      1m in height, raised terraces, etc) shall be constructed within this ‘zone of influence’ or within 1.5m of the
      centreline of the sewer main, whichever is the greater. In this regard the existing sewer main that
      traverses the site at the rear and the ‘zone of influence’ (taken as the area within a 45-degree angle
      measured from the invert of the sewer main to the finished surface level) shall be accurately located,
      determined and marked on site by a Licensed Surveyor prior to the commencement of any works.

20.   Suitable root barrier shall be installed where proposed trees are adjacent to paths, pavement etc in
      accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and Guidelines.

21.   The turning areas located on either side of the access driveway shall be suitably sign posted to indicate
      that the area is a “Turning Area Only” and that “No Parking is Permitted”.

22.   Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily installed into the
      first existing external downstream stormwater structure.
      These devices are to be checked and cleaned on a regular basis and specifically after each rain event.
      These devices are to remain in place during the civil works and construction phases of the development.
      The location and type of device to be installed shall be established at the “pre start” meeting with
      Council’s Construction Technical Officer and shall be installed prior to the commencement of any works.
23.   Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’ notice of
      intention to commence works to arrange a “pre start” meeting regarding the civil works.

24.   The principal contractor must have all the appropriate insurance and public liability documentation to carry
      out the works. The principal contractor is also responsible to ensure that any sub contractors also have
      the appropriate insurance and public liability documentation.

25.   Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council’s
      signed approved drawings and conditions by the applicant.

26.   The Consulting Engineers for the project shall be currently Registered Professional Engineers of
      Queensland (RPEQ). The consulting engineers are responsible for arranging all inspections, with
      Council’s Construction Technical Officer or nominated staff.

27.   Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project.
      (This person will be the contact for the project).

28.   Council standards shall apply to these works unless otherwise modified herein.

29.   The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
      during the construction of the engineering works to ensure that Council property, road pavements or
      facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
      furniture etc.) are protected against any damage or interference whatsoever.

      If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
      Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
      engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager Land
      Development and shall forthwith rectify the damage to that property or facility at its cost and to the
      satisfaction of the Manager Land Development.

      All rectification works are to be completed prior to the commencement of the use or, alternatively, the
      Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost
      being paid by the Applicant to the Council prior to the commencement of the use.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@4007a506\@[email protected]

Used in these records

About this file

File size
40 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED - 06_1101 Negotiated Decision Notice [As Published].pdf · 40 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.