                                                                                       2008/529


2.    Copies of the approved plans, duly signed by the consultant Registered Professional Engineer
      of Queensland (RPEQ) shall be provided to Council’s Construction Technical Officer at the
      “pre start” meeting.
3.    A registered easement 0.5m wide x 11.15m long, in favour of Sunshine Coast Regional
      Council, shall be created within the subject property along the “11.15m” long western
      boundary of that property. The purpose of this easement is to permit any stormwater runoff
      from the “Little Cove Road” road reserve to be discharged onto the subject property.
4.    Construction works within the development site, particularly the driveway construction, shall
      not cause any increase in stormwater runoff onto the adjoining residential properties.
5.    All landscaping is to be constructed in accordance with Council’s Planning Scheme Policy
      PSP03 Landscaping Plants and Guidelines.
6.    Suitable root barriers shall be installed where proposed trees are adjacent to paths, pavement,
      etc, in accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and
      Guidelines. Further, driveway construction within the drip zone of any existing tree shall
      be designed as a pervious pavement, such as grass paving cells or similar.
7.    Delete.
8.    Council’s Construction Technical Officer (ph 0410 512 505) shall be given seven (7) days’
      notice of intention to commence works to arrange the “pre start” meeting prior to the
      commencement of works.
9.    The principal contractor must have all the appropriate insurance and public liability
      documentation to carry out the works. The principal contractor is also responsible to ensure
      that any sub contractors also have the appropriate insurance and public liability
      documentation.
10.   Prior to the “pre start” meeting, the principal contractor must be provided with a copy
      of Council’s signed approved drawings and conditions by the applicant.
11.   The Consulting Engineers for the project shall be currently Registered Professional Engineers
      of Queensland (RPEQ).           The consulting engineers are responsible for arranging all
      inspections with Council’s Construction Technical Officer or nominated staff. Council’s
      Construction Technical Officer shall provide an inspection form for signing off by the Engineer
      at appropriate stages of construction, during on-site meetings. The Construction Technical
      Officer will also sign the form at each stage when requested conditions have been satisfied.
12.   Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
      project. (This person will be the contact for the project).
13.   Council standards shall apply to these works unless otherwise modified herein.
14.   The person acting on this permit shall ensure that its consultants and contractors take all
      reasonable care during the construction of the engineering works to ensure that Council
      property, road pavements or facilities (such as underground drainage, water supply,
      sewerage, footpaths, kerbing, landscaping, street furniture, etc.) are protected against any
      damage or interference whatsoever.
      If any Council property or facilities should be damaged by the Applicant or any of its
      Consultants or Contractors through any cause whatsoever in the course of, directly or
      indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
      forthwith notify the Manager Land Development and shall forthwith rectify the damage to that
      property or facility at its cost and to the satisfaction of the Manager Land Development.
      All rectification works are to be completed prior to the sealing of the survey plan or,
      alternatively, the Applicant may request Council to carry out the rectification work at the
      Applicant’s cost, such cost being paid by the Applicant to Council prior to the sealing of the
      survey plan.
                                                                                    Page 2 of 7

Used in these records

About this file

File size
56 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Letter - Change to an Existing Approval - 010.2008.00000529.001 [As Published].pdf · 56 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.