Decision Letter - Change to an Existing Approval - 010.2008.00000529.001 [As Published] · 142008.529

of 7

Text shows just the words. Original shows the document exactly as it was published.

                                                                                        2008/529


      In the case of any emergency, Council shall be entitled to rectify such damage at the cost of
      the Applicant, such cost being paid prior to the sealing of the survey plan.
15.   The development of the site shall be carried out in such a manner as to prevent dust and/or
      sand nuisance to residents and/or tenants in the vicinity of the development.
16.   Construction work and other associated activities are permitted only during the hours of 7.00
      am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
      except where extended hours are approved by the Manager, Land Development, or his
      nominee.
17.   All signage, including that for safety during construction, shall be in accordance with the
      Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
18.   Safe pedestrian access on Little Cove Road in the vicinity of the development shall be
      maintained at all times. If footpath / road closures are necessary to carry out construction
      works, Council’s Construction Technical Officer (ph 0410 512 505) must be notified prior to the
      proposed closure.
19.   Sediment and erosion control measures must be in place prior to works commencing. If such
      measures are not in place or are not satisfactory, “on the spot “ fines may be issued. Such
      fines can be issued if sediments from the site are found to enter or have the potential to enter
      Council’s stormwater system or natural waterways. Although the sediment and erosion control
      measures have been approved on SCG’s drawing No. 17268-OW1, Council’s Manager, Land
      Development, may request further controls to be installed should approved measures be
      inefficient.
20.   The owners of the subject property shall maintain the stormwater soaker pits in accordance
      with the manufacturer’s specifications.
21.   These works are also to be in compliance with the relevant conditions of Development Permit
      2007/0070 dated 24 October 2007.
22.   Notwithstanding that Council has checked the plans with due care, where it is found during
      construction that variations from Council's standards exist, then Council standards shall apply.
5     REFERRAL AGENCY CONDITIONS

Not Applicable.

6     APPROVED PLANS/DOCUMENTS
The approved plans for this development approval are listed in the following table:

 Plan No.            Rev.     Plan Name                                      Date

 0611 / WD.101       T2       Site Plan (by Kidd & Co)                       05.06.08

 0611 / WD.202       T4       Driveway detail (by Kidd & Co)                 05.06.08

 17268-OW1                    Silt Retention (by SCG)                        Oct 2007

 17268-OW2           A        Driveway & drainage detail (by SCG)            22.05.08

 17268-OW4                    Driveway Long Sect’n (by SCG)                  Oct 2007




                                                                                     Page 3 of 7

Used in these records

About this file

File size
56 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Letter - Change to an Existing Approval - 010.2008.00000529.001 [As Published].pdf · 56 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.