Original source · versioned page text
16-04-21 - 15128 - MorgansEngineers
Attached to the e-mail MCU15/0109 - Response to Information Request - Email 4 of 6.
MORGAN CONSULTING
E NGINEERS P TY LTD
15128/RP
designed to cater for ultimate development of Precinct E2. Additionally, the
Lake system within the Noosa Springs Golf Course incorporates on-site
detention to mitigate flows prior to discharging to Lake Weyba. The above has
been documented in the Noosa Springs Master Drainage Report prepared by
Ralph M. Grierson. Additionally, a capacity analysis of the existing
downstream piped system was provided in the Engineering Services Assessment
– Revision 1 prepared by Morgan Consulting Engineers. The report
demonstrates that the existing infrastructure has capacity to cater for the
fully developed site. The above has been confirmed with Cherie O’Sullivan of
Noosa Council as part of the Precinct F Development Assessment.
B) That the development will not adversely impact on the existing drainage
conditions on other properties (including road reserves and public roads) or on
the environment (E.g. causing erosion and sediment movement).
Response: Refer to Response to 9.A.
Water Quality
Issue – Lawful Discharge
Item 10: Demonstrate proposed water discharges will occur lawfully and the nature and
extent of easements required.
Response: Refer to Response to 9.A. Furthermore, an internal gravity drainage system
will be constructed to cater for minor storm events whilst the internal road
network will be designed to cater for the major storm events.
Issue – Velocities and Residence Times
Item 11: Demonstrate how predevelopment ARI velocities will be maintained to ensure
waterway stability pursuant to the State Planning Policy and how water flows
will be managed to adequately manage residence times within the lake system.
Response: As documented in the Noosa Springs Master Drainage Report prepared by Ralph
M. Grierson, the Noosa Springs lake system incorporates on-site detention to
maintain pre-development peak flow rates prior to discharging into Lake
Weyba. The system has been designed to mitigate flows from the fully
developed contributing catchment which includes Precinct E2 for storm events
which include the 1 year ARI event.
The stormwater quality treatment options for Precinct E2 are currently being
assessed in parallel with Precinct F with consideration given to the existing
lake system. We request that a Site Based Stormwater Quality Management
Plan for Precinct E2 be conditioned as part of the development approval.
Issue – Stormwater Treatment
Item 12: Demonstrate how nutrients within stormwater runoff will be managed to
ensure that the proposed development will not be responsible for nutrient
related problems within the lake system and to meet relevant stormwater
quality treatment codes and policies. Provide a Management Plan for approval
for any proposed measures.
Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.