Council archive · source document
Delegated Report - Code - Planning OPW24 0172 {As Published} · OPW24/0172
Street address: 5 Adams St Sunshine Beach Qld 4567 Real property description: Lot 547 RP 48112 Planning Scheme: Noosa Plan 2020 (25 September 2020) 2. DECISION DETAILS Council decided to issue the following type of approval: • Development Permit for Operational Works – Roadworks 3. CURRENCY PERIOD OF APPROVAL The currency period for this development approval is stated in the conditions below. 4. ASSESSMENT MANAGER CONDITIONS APPROVED PLANS 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 1 “Aerial Plan with Dimensions” 21/10/2024 Prepared by Pivotal Perspective (AS ANNOTATED IN RED BY COUNCIL) CURRENCY PERIOD 2. The Currency Period for this development approval lapses if the development has not substantially started by 29 October 2026, unless an application to extend the currency period is approved by Council. GENERAL CONDITIONS Engineering 3. A condition report including photographs of the frontage of the site must be completed and submitted to Council prior to the prestart meeting. 4. The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any subcontractors also have the appropriate insurance and public liability documentation. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. 5. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The pre-start meeting must include the relevant parties for the following aspects of the works: a. Civil engineering works; b. Landscaping works. 6. A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following: a. Traffic Management during the construction phase; b. Appropriate traffic signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD); Page 5 of 8 Document Set ID: 23324584 Version: 4, Version Date: 29/10/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW24 0172 {As Published}Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.