7 ! i oF y ' Woolley Residence 10 Park Road Noosa Operational Works Application 1 Construction Management Plan i Construction Management plan prepared by Blakeney Munz Consulting Engineers This report considers the construction management plan for the proposed Robertson Residence at 10 ; Park Road Noosa. j 1.1 Submission by Builder The builder is to submit written acknowledgement that the building works shall proceed with the 9 tonne load limit applicable to Park Road. i The builder is to submit written acknowledgement that all the works will be carried out in accordance with the construction management plan. The builder is to submit a construction program; any deviations from the program will be notified to i council The builder is to submit detailed plans of existing vegetation on site showing all trees to be retained The builder is to submit a traffic management plan showing responses to any potential conflicts to local j traffic. No builder's vehicles will be parked on Park Rd The builder is to submit a colour scheme showing compliance with DA22441 The Builder is to submit a properly prepared landscape plan showing retention of existing vegetation f and measures to control erosion and sediment 1.2 Basement Construction The method of construction to be used is a top down construction using continuous flight auger piles ; for the temporary/permanent retaining walls and the roof slab as the temporary/permanent lateral support to the retaining walls. This method of construction does not produce any significant vibrations. f The proposed method of construction is summarized below: o Peg out extent of proposed garage and install Temporary fencing to the perimeter f o Grub up vegetation and re grade the slope locally to form a working platform o Screw piers are to be installed behind the location of the contiguous concrete bored piers. treated timbers are to be installed behind the bored piers as the spoil is excavated i This will continue down to RL11.0 thus forming a stable building platform for the contiguous concrete bored piers © Install contiguous concrete bored piers to the perimeter to a depth of approximately § 2.0m below the proposed basement level. o Reduce levels within the garage area to underside of the proposed roof level o Cast the roof slab on ground to provide permanent propping to the retaining walls i o Complete excavation beneath the new slab and cast the basement slab on ground.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A7F25.001.pdfRelated documentPublic source context ↗
09/0578 - Operational Works - Landscaping, Carparking, Access, Frontage Works, Stormwater Drainage, Site Civil Works, Sewer & Water Reticulation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.