The screw piles will be also be delivered to the site via Park Road and lifted to their point of installation
using an overhead hoist. The installation of screw piles in loose sand does not produce any spoil and
i therefore there will be no need to remove any excavated material from the site.
The spoil from the cut to the main bedroom excavation will be removed from site using a system of
f proprietary plastic chutes; this excavation will be done at the same time as the garage excavation
There are approximately 50 screw piles and 20 raking pile anchors which are required to support the
i proposed dwelling; and based on previous experience the installation would be completed within ten
working days.
i On completion of the foundations, the excavator will be used to install the columns and timber retaining
walls.
i Morrison Geotechnics has been retained by the owners as the geotechnical engineers and will be
present on site for the duration of foundation construction and slope stabilization.
j 1.6 Pool Construction
Excavation for the pool structure is minimal and will be undertaken by hand. The spoil will be removed
i from site using a bobcat from the roof of the garage.
The pool is to be supported on a combination of vertical and raking piles. The raking piles will provide
i local stabilization of the slope around the pool.
Concrete for the pool shell will be delivered to the site via a concrete pump.
i 1.7 Storm water Drainage
i Storm water will be collected by a conventional arrangement of gutters and downpipes and piped
through the garage to the council storm water main in Park Road. The storm water will connect to the
council main via a gulley pit to limit surcharge.
i 1.8 Sewerage
A conventional gravity system is proposed. It will connect into the council sewer pit on Park Road
immediately in front of the proposed new driveway.
1.9 Clearing
i The proposed development retains all the significant trees on the property. A single tree positioned
directly over the location of the proposed swimming pool [tree 47] is to be removed. On completion a
f similar tree will be replanted near its’ original location. This proposal has already been approved by
council.
A Prior to construction, all trees will be tagged and recorded to a survey plan. On completion, the trees
will be re-surveyed to ensure compliance with the conditions of the development approval. It is
proposed to replant beneath the house with shade tolerant native species.See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A7F25.001.pdfRelated documentPublic source context ↗
09/0578 - Operational Works - Landscaping, Carparking, Access, Frontage Works, Stormwater Drainage, Site Civil Works, Sewer & Water Reticulation [As Published]Related documentApplication case desk ↗