Council archive · source document
001A7F25.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
' 3 Car parking and Access
i 3.1 car parking
The garage fronting onto Park Rd will be accessed by a concrete driveway ramping up from a new
crossover to the garage area that will house at least 2 cars, have ceiling height of 2.6 meters a turntable
i will be installed to the floor of the garage as per the following plans and specifications
i 3.2 Access ‘ ;
i A vehicular access driveway to serve the site will be constructed from the Park Road frontage of
the site with a maximum width of 3.0 metres.
i The driveway will be designed and constructed to Council’s design standards and to grades that
prevent vehicles from scraping and/or bottoming.
All vehicles shall enter and leave the site in a forward direction.
i All vehicles shall enter the site via a right turn and exit the site via a left turn.
Council Officers will approve vegetation trimming within the road reserve required to improve the sight
distance
| | | |
i | | | |
$I —t
{ |
i 1000 ! 5297 1000
| | L | I
\ | 0 | |
i | oO! i 6.4
>
| { x -
| | | |
i | 11:84
| ; | 1
4.9 4 roa 4
i 1:8 correct gradient
1: 4.238
Driveway gradient sectionSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A7F25.001.pdfRelated documentPublic source context ↗
09/0578 - Operational Works - Landscaping, Carparking, Access, Frontage Works, Stormwater Drainage, Site Civil Works, Sewer & Water Reticulation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.