Ifyou answered "Yes to. Q12,the application
triggers referral’ to Bont Aula .
y. 007m. of ‘@Shipping charinékor.anenty.
and exit shipping cortidor for the poit
“© within 1000m ofa swing be
sipping wir, a'mooi
Identified iri a land-use plan approved tin ir
sthe Transport intrastructuré Act 1994, . °°,
In alt other situation the Port Authority i isan
advice agency.
IDAS Assessment Checklist, Version 20, 2 April 2007
12. Does the-application involve development below high water mark's and within the limits of a poit
undeyshe Transport Infrastructure Act 1994? -
10 . .
(YES -compiete Part M of.Form 1, or Part P of Form 1 if the work is prescribed tidal work
i Matinas
“For more information refer.to. Guide 18, For
iifformation about whether a marina is prescribed
tidal. work refer to Guide:24. The'tocal
* S the
it you answered “YES to to'Q13, the appteaton +
triggers referral to- Queensland Fire aiid Restue :
Setvicg as an advice agency.
I works i in strategic portland ial
“areas. ve
Forti imore inform or efer to Guide 8.
“Unless you answered: *NO" to: 014; ‘the relevant
“Port Authority is the assessment manager for the
application and'the Environmentat Protection
Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the application,
“Heritage
For further information refer. to Guide 19.
. Ifyou answered "YES" to Q15, the application
viggers referral. to the Queensland Heritage
Council as concurrence agency for the
application,
Unless you answered “none of the above” to
Q15(b), the application involves reférral to the
Environmental Protection Agency as an advice
agency for the application
Declared catchment areas
For more information, including a list of the
declared catchiient areas within Queenstand,
refer to Guide 13,
Unless you answered “none of the above” to
Q46, the application requires assessment by the
Department of Natural Resources and Water
(NRW).
If an agency other than NRWis the assessment
manager for. the application, NRW is a
concurrence agency for the application i in
elation to this matter.
443.
Does the application involve operational work that is tidal work for a mafna® with more than 6
berths? :
» vessef
NO
oO YES. complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
wh une eA eet ce pet =
Does the application involve tidal works within a strategic port land tidal area?)
Yn .
0
[1 YES - complete Part M of Form 1
Doesthe application involve development ina heritage registered nlace as defined under the -
Qugensiand Heritage Act 1 992?
NO
OYes- complete Part C of Form 4
15(b)The application involves: (tick applicable boxes) .
{i) a material change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
. Heritage Act 1992;
LI (ii), reconfiguring a lot if the lot shares a common boundary with a protected area or
wh registered place under the Queensland Heritage Act 1992;
(ili) none of the above.
16. The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)
Oo (i) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
C1 (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994:
none of the above
"
18 High water mark-is defined in the Coastal Protection
19 Marina is defined in the Transport Operations (Maritit
and Management Act 1995 and means the ordinary high water mark at spring tide.
ime Pollution) Regulation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of ‘high water mark adjacent to strategic post land.
Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1812 - Preliminary Building works assessable against planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.