INTEGRATED PLANNING ACT 1997
Operational work that Is tidal work or
work in coastal management district

. For mare information refer to Guide 18. For

More information about prescribed tidal work in
focat govemment tidal areas refer to Guide 24.
‘Unless you answered “none of the above’ to Q9,
the application requires assessment by the
Environmental [Protection Agency (EPA).

‘agency other than EPAjs the assessment
er for the application, EPA isa,

ence agency for the application in

   
 

    

is the assessment manager

* for ally iprescibed ‘tidal work.

\
‘

IDAS Assessment Checklist, Version 20, 2 April 2007
9. The application involves operational work that is: (tick the applicable box/es)

[())_ tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; Of

C1 (ii) tidal work that i is prescribed tidal work'\other than in a canal"? ~complete Part P of Form 1; 0r

C1 fil) carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a) to (i) below are ticked,

(1 (@)_ constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ; .

constructing a canal12 intended to be connected to tidal waters;
constructing an artificial waterway;

teclaiming land under tidal water;

disposing of dredge spoil or other solid waste material i in tidal water;
interfering with quarry material on State coastal land above high-water mark;

draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;

removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

Oo)
Ov)
OO)
De)
OM:
O@)

O(n)
i.

constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high -water mark; or

iv) none of the above.

 

. ‘Operational work, below high: “water .

mark . .
For more information refer to Guide 18. For
more information about prescribed tidal work in
local goverment tidal areas refer to Guide 24.
Unless you answered “none of the above" to
Q10, the application triggers referral to

Queensland Transport (QT) (Maritime Safety

 

 

~ Qld) as a concurrence agency.

Local government is the assessment manager

for all prescribed tidal work,

10. The application involves.operational work that is: ( tick the applicable ‘paues)

LD (i) tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work = complete Part M of Form 1; OF

(1 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; OF .
C1 (iii) carried out within a coastal management district'S under, the Coastal Act and for -
(1 (a) disposing of dredge spoil or other solid waste material in tidal water - ~ complete Part

M of Form 1, \
0 (b) reclaiming land under tidal water - complete Part M of Form 1; OF
(c)

constructing a canal12, if the canal is associated with reconfiguring a lot -
complete Part M of Form 1;

(iv) none of the above. wos

 

Coastal management

For more information refer to Guide 18.

Unless you answered “none of the above" to
Q11, the application requites assessment by the
Environmentat Protection Agency (EPA).

If an agency other than EPA is the assessment
manager for the.application, EPA is a
concurrence agency for the application in
relation to this matter.”

 

11. The application involves: (tick the applicable bowes)

CO (i)  amaterial change of use assessable under a planning scheme involving operational
work carried out completely or partly'i in a coastal management district’
Diii

a material change of use assessable under a planning scheme involving building @
work, cartied out completely or partly in a coastal management district that is -

« the construction of a new premises with a GFA" of at least 1000m2
+ the enlargement of the GFA of existing premises by more than 1000m?

reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or: partly in a coastal management district

reconfiguring a lot"? assessable under schedule 8 of the IPA and in connection with
the construction of a canal12 — complete Part M of Form 1 .

none of the above

| (iii)
Ow
v

 

10 Tidal work is defined in sch 10 of the IPA.

11 Prescribed tidal work is defined in lhe Coastal Protection and Management Regulation 2003 and includes certain tidal works compietely or partly within a local government tidal area,
12 Canat means canal as defined under the Coasta! Protection and Management Act 1995 - : .

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain dal works completely or patty vithin @ local government tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means.a coastal management district under the Coastal Protection and Management Act 1995, other than an area deciared as a~

coastal management district under section 47(2} of that Act.

16 GFA is defined in sch 14 of the IPA to mean the gross ficor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.

17 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the avtificial waterway.

Page4

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1812 - Preliminary Building works assessable against planning scheme [As Published].pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.