INTEGRATED PLANNING ACT 1997
Works that take overland flow water

The relevant wild river declaration will state
works that take overland flow water are either
Self assessable or assessable, or are exempt
from wild river requirements.

Wfyou ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

If you ticked Q13 ii) an ‘application i isnot required
tobe made however the works must comply with’
the relevant self-assessable section of-the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW:
“against the retevant part of the Wild-Rivers Gode
and must comply with the code,

Ifyou ticked Q13 iil) your application is.not
subject to wild river requirements.

Applications for devélopmient that i is’ ather than y
that stated to be assessable, self-assessable or
éxempt will notbe accepted, u

 

13.

IDAS Assessment Checklist, Version 20, 2 April 2007

. pee application involve works that take overland flow water in a HPA or an FMA?

oO YES (ensure you! have completed Part Kz of Form 1)

If YES, is the ‘application for works stated in the relevant wild river declaration to be?
(Ji) assessable works

(J ii) self-assessable works

(iil) exempt works

 

 

“Works that interfere with overland:
flow water

~The relevant wild river declaration will state
‘Works that interfere with overtand flow water that

are elther sélf assessable, assessable or exeript
ftom Wild river. requirements,

ityou ticked Q15 i), your application must be
assessed by: NRW against the Wilt Rivers Code"
“and Tust comply with the code. .

“lfyou ticked Q16 ii} an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the retevant part of the Wild-Rivers Code
and must comply with the code.
“Ifyou ticked Q15 iii) your apptication is not
+ Subject to wild river requirements.
Applications for development that is other than
. that stated to be assessable, self-assessable or
exempt will not be accepted.

 

Waterway barrier works

Apptications for building or raising waterway
barrier works in a HPA will not be accepted,
If you answered YES.to Q16, your application
must be assessed by DPIF against the Wild
-Rivers Code and must comply with the code.

16.

. Pore application involve works that interfere with overland flow water in a FMA?

Clyes (ensure you have completed Part Kio of Form 1)

If YES, is the application for works stated in the relevant wild rivers declaration tobe?
(LJ i) assessable works

O il) self-assessable works

Lili) exempt works —

oe involve building or raising waterway barrier works in a PA?
O° (1 YES (ensure you have completed Part O3 of Form 1)

 

 

Aquaculture (non ERA)

Applications for aquaculture in a HPA will not be
accepted.

lf you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

re ones involve aquaculture in a PA?
NO O YES (ensure you have completed Part O; of Form 1)

 

Works that interfere with water in a
watercourse

Note: If the development is proposed in a HPA,
applications for all works that interfere with water
in a watercourse (including dams or weirs,
stream realignment or stream diversion) will nat
be accepted.

Ina PA, applications for insteam dams and
weirs may be accepted in nominated waterways.
Ifyou ticked box i) in Q19, your application will
not be accepted.

‘Note: Operational works outside a HPA or

nominated waterway are not subject to wild
rver requirements.

More information and locations of nominated
swaterways is available by contact NRW,
accessing the department's website
www.niw.qid.qov.au or contacting the
-department by email on:

wild [email protected] the application involve operational works that interfere with water in a watercourse that is in
a nomifiated waterway in a PA? -

oO O YES (ensure you have completed the relevant Part K of Form 1)

If YES,
oO i) The application is for an instream dam or weir; or

oO ii) The application is for operational works that interfere with water in 4 watercourse, and is
for development other than a dam or weir.

Page 13

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1812 - Preliminary Building works assessable against planning scheme [As Published].pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.