07/1812 - Preliminary Building works assessable against planning scheme [As Published] · 172007.1812

of 36

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997
‘Environmentally relevant activities

Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
Tequire referral to the EPA. The assessment of
some ERAs is assessed by NRW, others have
‘been devolved to DPF, NRW’ or delegated

- locat government (see.EPA website for more
information on devolved ERAs)

lf you answered NO to Q20 you do not need to
complete Qs 21-24. .

- you angered YES to Q20 and the
development is ina PA, your application ‘must be

 

~-with thé code,-unlass the proposal is for”
development where an rappiication wiltnot be
ig exempt from-wild iver

{see Q2). You will be able to

  

determine if an-application wilt not be accepted: ]

for the development by answering O24 = = 24.

Ifyou answered NO:to Q21, , you:do not need to
complete Q22,

 

with the ‘code. °
alf yous answered NO

 

    

against the Wild Rive! ‘Code and must comply . |

with the code.

(f you answered YES to-Q24 the application will - ‘|.

“not be accepted. If you answered NO to Q24,
your application must be assessed by NRW
against the Wild Rivers Code and: must comply |
with the code.

Exempt ERAs ina designated urban
area

If the development is proposed ina designated
Urban area theré may be no wild river
requirements.’ See Section 2 Q2.

Note: Ail applications tliat can be accepted must
be assessed against and must comply with the
Wild Rivers Code (other than exempt ERAs in a
designated urban area).

20.

21.

22.

423.

     
   

ope application involve an ERA? .
NO , I YES (ensure you have completed Part G of Form1)

Is th
Eno

0

pplication for an ERA 20 instream?

Cyes

C1yYes

\

IDAS Assessment Checklist, Version 20, 2 April 2007

ho allocation notice held for the proposed ERA 20 instream?
N

Does the application involve any of the following ina HPA?

i) a level 2 ERA 11, {and is for specified works or a residential complex)

ii) an ERA 19 (dredging)

ili} Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)

iv) an ERA 22 (out of stream)

LIno

Cves

Is the proposed development for ERA 20 (out of stream) and;

— ina
— not

FMA;and |
low impact, and .

— not for a residential complex in the area, or for specified works.

Ono

El yes

 

Documentation

you answered NO to Q25, your application
may be subject to an information request and
Processing of the application may be delayed.

 

125.

Has documentation been included with the application describing how the applicant proposes to
- comply with the mandatory requirements, required outcomes, and/ or performance requirement
as set out inthe relevant part/s of the Wild Rivers Code?

LINno

Cl yes

 

ay

The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW.

Page 14

%

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1812 - Preliminary Building works assessable against planning scheme [As Published].pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.