3.0 METHOD OF INVESTIGATION
As part of our assessment, a desk-top study was carried out comprising a review of published geological
maps and Noosa Shire Council (NSC) planning overlays and site information.
An experienced geotechnical engineer from Tectonic undertook a site walk-over on 9 June 2022 to visually
identify any indicators of past slope instability. The walk-over included assessment of soil exposures,
surface drainage conditions, topography, evidence of erosion or past instability, and vegetation
coverage/condition.
This was incorporated with a subsurface investigation comprising the drilling of two boreholes (designated
BH1 and BH2) in accessible areas across the site. Borehole BH1 was drilled in the eastern part of the site
using Tectonic’s 4WD mounted solid flight auger rig to 6 m below ground level (BGL). Due to access
restrictions, borehole BH2 was drilled in the western part of the site to 5.5 m BGL using hand augering
techniques.
In-situ testing, using the dynamic cone penetrometer (DCP) method, was carried out from the ground
surface and within each borehole. Boreholes were backfilled on completion using spoil excavated during
drilling, with excess material slightly mounded at the surface.
Laboratory testing was not warranted due to the sandy nature of the subsurface conditions encountered.
Borehole locations are shown in Figure 1 attached at the end of this report, with borehole and DCP logs
presented in Appendix A, together with explanatory notes. Borehole coordinates were recorded using a
handheld global positioning system (GPS).
The results of the desk-top study and walk-over survey are included in Section 4 below.
4.0 RESULTS OF INVESTIGATION
4.1 Site Description
The site is formally described as Lots 0 to 2 on BUP4358, covering a combined area of about 525 m2, with
frontage to Henderson Street along the eastern boundary. At the time of the investigation the site contained
a two-storey, residential unit building, with an asphalt sealed driveway connecting to Henderson Street. The
grounds contained various small garden spaces and terraced outdoor areas. Neighbouring properties
consisted of residential allotments, with a combination of low-rise houses and multi-storey unit buildings.
Inferred cut and fill earthworks had taken place across the site and adjacent areas. The site had been
levelled with cutting estimated up to about 1.5 m deep and filling visually estimated to be up to about 1 m
high to form garden beds and terraced areas. Cut and fill embankments were retained by the existing
building as well as low height timber sleeper walls (<1.5 m high).
The existing building, timber sleeper walls and driveway exposed signs of dilapidation (e.g. rotten wooden
panels, cracking etc.), which is likely related to age, poor construction and possibly consolidation of the
upper loose sands rather than global slope instability. A 2022 aerial image of the site and surrounds is
shown in Text Figure 2 overleaf.
29 June 2022
Report No. 22227-001-Rev0 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
geotech and slope stability.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.