Council archive · source document
REPS - Engineering Plans · MCU24/0153
Plans and drawings: the text below has words only, no drawings.
Original PDF page 18, section 1. The text section number identifies this passage in the reader.
North Point Approved Project Address Sheet Title
E WHITMORE
RPEQ 31423
51 ELANDA STREET SUNSHINE BEACH QLD
DRAINAGE CALCULATION TABLE
For and on behalf of RECOR Pty Ltd.
Scale ENGINEERING + PROJECT MANAGEMENT Client Details Project Name Sheet Size
SUNSHINE COAST | BRISBANE | SYDNEY
SCALE
0.2 0 0.2 0.4 0.6 0.8 1.0
(metres)
www.recorconsulting.com | ABN 89 647 469 707 ARCHEND PROPOSED MULTIPLE RESIDENCE A1
A 26/09/25 ISSUE FOR OPW APPROVAL DP AY 1 : 20 (FULL SIZE) COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's client. This Project Number Sheet Number Revision
drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as 'Issued For Construction'
Rev Date Revision Description Drawn Check DO NOT SCALE, IF IN DOUBT ASK in the revision description. 20240127 045 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REPS - Engineering Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.