GENERAL NOTES
SEWER AND WATER NOTES DRAINS TO AVOID RISK OF BACKFLOW CONTAMINATION WHEREVER
CP
S
POSSIBLE. 1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT
1. REFER HYDRAULIC
CONNECTIONS.
DRAWINGS FOR INTERNAL DETAILS AND BUP106270 BLACKTOWN CITY COUNCIL AND SYDNEY WATER SPECIFICATIONS AND
15. SEWER MUST MAINTAIN A MINIMUM VERTICAL CLEARANCE OF 500MM STANDARDS.
>
BELOW A WATER MAIN AND SHALL BE OFFSET BY A MINIMUM HORIZONTAL
S
2. REFER ARCHITECTURAL PLANS FOR DIMENSION SETOUT DETAILS. CLEARANCE OF 1000mm. 2. UNLESS SPECIFIED OTHERWISE ALL MATERIALS AND WORK SHALL
COMPLY WITH THE RELEVANT AUSTRALIAN STANDARDS.
>
3. CONTRACTOR TO POT HOLE TO LOCATE ALL SERVICES AND CONFIRM 16. WATER MAINS ARE TO BE FLUSHED, CHLORINATED AND PRESSURE
DEPTH PRIOR TO COMMENCING WORKS AND TO ENSURE THAT ALL NEW TESTED AFTER INSTALLATION. THE CONTRACTOR SHALL PROVIDE THE CP 3. ADOPT LIP OF KERB OR SHOULDER OF ROAD AS PERMANENT LEVEL.
S
WORKS ARE IN ACCORDANCE WITH THE REQUIRED LEVELS. RESULTS OF THESE TESTS TO THE SUPERINTENDANT PRIOR TO BUP102822
>
ON-MAINTENANCE INSPECTIONS. 4. A WATER METER SUPPLIED AT THE DEVELOPER'S COST, IS TO BE
4. ANY DISCREPANCIES BETWEEN THESE PLANS AND ARCHITECTURAL OR
INSTALLED AT THE SERVICE POINT OF THELOT IN ACCORDANCE WITH THE
HYDRAULIC PLANS ARE TO BE REFERRED TO THE ENGINEER
>
17. CLEAN OUTS, INSPECTION OPENINGS AND CLOSING CAPS SITUATED IN REQUIREMENTS OF SYDNEY WATER.
S
IMMEDIATELY. VEHICULAR OR PEDESTRIAN PAVEMENTS ARE TO BE FITTED WITH EITHER
BRASS OR CAST-IRON COVERS. 5. ALL CONCRETE FOOTPATHS TO BE CLEAR OF WATER MAINS.
>
5. ALL WORKS ASSOCIATED WITH LIVE SEWER OR WATER SERVICES AND
MAINTENANCE HOLES SHALL BE CARRIED OUT BY SYDNEY WATER OR AN 18. ALL IN-GROUND VALVES SHALL BE IN APPROVED CONCRETE PATH BOXES
APPROVED AND LICENSED CONTRACTOR AT THE PRINCIPAL 6. THE CONSTRUCTION OF THE WATER RETICULATION WORK SHOWN ON
S
IN ACCORDANCE WITH THE AUTHORITIES REQUIREMENTS. THIS DRAWING MUST BE SUPERVISED BY AN ENGINEER WHO HAS RPEQ
>
CONTRACTORS COST.
REGISTRATION. WORKS NOT COMPLYING WITH THIS REQUIREMENT WILL
19. ALL WASTE PIPES AND WATER SERVICES PENETRATING SLABS ARE TO BE NOT BE PERMITTED TO CONNECT TO THE RETICULATION SYSTEM
6. THE MINIMUM GRADE FOR ALL SEWER PIPES SHALL BE WRAPPED IN AN APPROVED FLEXIBLE JOINT WRAPPING. PROPOSED NEW SEWER
>
6.1. Ø100mm - 1 IN 60
S
HOUSE CONNECTION.
6.2. Ø150mm - 1 IN 150 CONNECTION LEVEL TO MATCH
20. ALL SERVICES ARE TO BE PROTECTED IN ACCORDANCE WITH THE
6.3. Ø225mm - 1 IN 290 EXISTING CONNECTION.
REQUIREMENTS OF THE AUTHORITY RESPONSIBLE FOR THE SERVICE.
>
6.4. Ø300mm - 1 IN 420
21.
S
7. SEWERS HAVING GRADE EXCEEDING 1 IN 20 SHALL REQUIRE CP
>
BULKHEADS/TRENCHSTOPS. GTP689
>
8. WHERE SEWERAGE IS TO CONNECT INTO EXISTING SEWER MAINS, THE
S
CONTRACTOR MUST VERIFY THE LOCATION AND LEVELS OF THE
CONNECTION POINT PRIOR TO COMMENCING WORKS.
>
9. PIPE EMBEDMENT SHALL BE COMPACTED IN LAYERS NOT EXCEEDING EXISTING SEWER
S
300MM LOOSE DEPTH TO A MINIMUM 95% MAXIMUM COMPACTION AS PER CONNECTION TO CAPPED OFF.
>
AS 1289.
8
45.
0
10. ALL SEWER AND MAINTENANCE STRUCTURES SHALL BE INSPECTED BY
46.
S
>
CCTV AFTER ALL BACKFILLING OPERATIONS ARE SATISFACTORILY
2
46.
COMPLETED AND ALL JUNCTIONS INSTALLED. THE CONTRACTOR SHALL
4
46.
VERIFY THAT THE PIPE IS WITHOUT ANY CONSTRUCTION DEFECTS, THERE
>
T
6
ARE NO OBSTRUCTIONS TO FLOW AND ALL APPROVED JUNCTIONS ARE IN
EN
46.
S
THE RIGHT LOCATION. THE CONTRACTOR SHALL PROVIDE THIS M
8
E
46.
INSPECTION TO THE AUTHORITY UPON REQUEST. AS
0
B
47.
TO
MANHOLE LID TO BE LIFTED
2
47.
11. WHERE A SEWER IS TO BE CONSTRUCTED UNDER AN EXISTING OR 100mm ABOVE DESIGN
AY
S
4
PROPOSED STORMWATER PIPE ≥ Ø375MM OR THROUGH AN UNLINED REFER TO ARCHITECTURAL SURFACE
47.
OPEN DRAIN OR CHANNEL, THE SEWER IS TO BE CONCRETE ENCASED. EW
IV PLANS FOR BUILDING DESIGN
6
47.
ENCASEMENT SHALL EXTEND AT LEAST 1M EACH SIDE OF THE PIPE OR
DR
8
47.
CHANNEL WITH CLEARANCE TO OTHER SERVICES MEASURED FROM THE S S S
0
OUTSIDE OF THE ENCASEMENT.
48.
43.2
.96
2
48.
43
43 .4
12. ALL SANITARY HYDRAULICS AND WATER RETICULATION IS TO BE IN
43 .6
4
43
.63
48.
44 .8
43
44.2.0
ACCORDANCE WITH AS3500, SYDNEY WATER SPECIFICATIONS AND
COMPLY WITH THE REQUIREMENTS OF THE AUTHORITIES HAVING 6
48.
RELEVANT JURISDICTION.
4 4.4
4 4.6
8
45.40.8
48.
4
13. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND
APPROVALS PRIOR TO COMMENCING WORK.
0
49.
NOTE:
4 5.2
45.56.4
14. WATER MAINS SHOULD ALWAYS CROSS OVER SEWER AND STORMWATER
4
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
49.2
IDENTIFY AND LOCATE ALL SERVICES ON SITE AND
45.8
WITHIN THE WORKS AREA FOOTPRINT. WHERE ANY
DISCREPANCIES OCCUR BETWEEN THE INDICATED
OE
46.0
POSITIONS AND LEVELS AND THE LOCATED SERVICES,
RECOR IS TO BE NOTIFIED AS SOON AS POSSIBLE.
46.2
NEW LARGE WATER METER
.32
WITHIN SITE. SIZE AND 49
46.4
METER ASSEMBLY TO BE
OE
49.4
COORDINATED WITH
46.6
HYDRAULIC ENGINEER. 7
LEGEND:
.8
46.8
49
EXISTING CONTOURS
EXISTING WATER METER
OE
49
TO BE REMOVED.
47.0
.9
EXISTING BUILDING
0
.6
49
85
5.4
9.
47.2
4
W
0m
VISITORS PARKING W EXISTING WATER
47.4
49
W 0
.6
.8
S
49
49 EXISTING SEWER
5
.6
7
47.6
49
.92
OE
PROPOSED CONTOURS
.7
49 46.0
7T
W
K
47.8
W
49
4.
ADJACENT BOUNDARY
.
49.
00
66
48.0
6
m
PROPOSED BOUNDARY
49
EXISTING WATER CROSSING W
49
0
.61
.9
.9
TO BE REPLACED WITH DN50 49
1C
EB
49.6
PROPOSED STORMWATER PIPE
R
7
CROSSING TO BOUNDARY.
48.2
.7
W 49
SIZE TO BE CONFIRMED WITH W
PROPOSED STORMWATER PIT
5.
HYDRAULIC ENGINEER.
48.4
00
OE
49
.54
m
EB
RETAINING WALL
48.6
W
0m
2.5
1.5
49
> > > PROPOSED SWALE
.4
W
0m
8E
48.8
B
W PROPOSED WATER
49
W
.5
5C
49.0
ERL
S PROPOSED SEWER
CP
AN
49
DA
SP193676
.33
49.2
W PROPOSED CONCRETE PAVEMENT
OE
W
ST
EB
RE
ET
PROPOSED FOOTPATH
W
49.2 PROPOSED BITUMEN PAVEMENT
49
.08
EB
OE
49
.1 8C
R
.53
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REPS - Engineering Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.