GENERAL NOTES 21. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE BOUNDARY f. STORMWATER STRUCTURE BASE SLABS
WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF THAT LAND INCLUDING BUT
1. ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN. g. PAVEMENT SUBGRADE
NOT LIMITED TO PRIVATE PROPERTY, ROAD RESERVE, PARKS/OPENSPACE, EASEMENTS.
2. ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR h. PAVEMENT REINFORCING
22. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION DRAWINGS AND
TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY SETOUT THE WORKS. APPROVALS ON SITE AT ALL TIMES. i. PAVEMENT PRIOR TO SEALING (PRESEAL)
3. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND 23. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN ACCORDANCE j. RETAINING WALL FOOTING REINFORCING
WHERE FURTHER DETAILS ARE REQUIRED THE CONTRACTOR SHALL REFER TO NOOSA WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND CONSTRUCTION CODE k. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL
SHIRE COUNCIL DEVELOPMENT GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, (2013).
ASSOCIATED STANDARD DRAWINGS AND SPECIFICATIONS U.N.O. l. STEEL REINFORCEMENT OF CONCRETE STRUCTURES
3. SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF THE m. PRACTICAL COMPLETION
TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND LOCAL AUTHORITY
STANDARD SIGNS AND LINE MARKING NOTES
n. ON MAINTENANCE
REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT THEIR COST INCLUSIVE OF ANY 1. GENERAL
ADDITIONAL COSTS INCURRED BY RECOR. o. OFF MAINTENANCE
1.1. ALL SIGNS AND PAVEMENT MARKING IS TO BE IN ACCORDANCE WITH THE
4. EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS SUCH THEIR QUEENSLAND TRANSPORT MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES p. ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER DEVELOPMENT
ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS TAKEN BY RECOR OR THE (CURRENT EDITION). APPROVAL)
PRINCIPAL FOR THE ACCURACY AND COMPLETENESS OF THIS INFORMATION. IT IS THE 2. SIGNS
RESPONSIBILITY OF THE CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND SERVICES NOTES
LEVEL OF ALL EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY 2.1.
ALL SIGNS TO BE REFLECTORISED CLASS 1 TO AS1906.1:2007 UNLESS NOTED 1. UNLESS OTHERWISE STIPULATED BY TELECOMMUNICATIONS LEGISLATION AT THE TIME
DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT. CONTRACTOR TO OTHERWISE. OF CONSTRUCTION, THE DEVELOPMENT MUST BE PROVIDED WITH ALL NECESSARY
LOCATE AND PROTECT SERVICES AS REQUIRED DURING PROPOSED WORKS. 2.2. SIGNS ARE TO BE INSTALLED WITH THE FOLLOWING CLEARANCES TO EDGE OF SIGN: CONDUITS, PITS AND PIPES TO ACCOMMODATE THE FUTURE CONNECTION OF OPTIC
LOCATION CLEARANCE NO KERB 600 BEHIND GUIDE POSTS BARRIER KERB 300 FROM FIBRE TECHNOLOGY TELECOMMUNICATIONS.
5. THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND SURVEY ALL FACE MOUNTABLE KERB 500 FROM FACE OF KERB.
CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN ON THE DRAWINGS 2. CERTIFICATION MUST BE SUBMITTED TO COUNCIL FROM ALL RELEVANT SERVICE
2.3. PARKING CONTROL SIGNS TO BE MOUNTED TO FACE APPROACHING TRAFFIC AT 45° PROVIDERS (ENERGEX, NBN AND UNITYWATER) WHICH CERTIFIES THAT THE
INCLUDING ANY POTENTIAL EXISTING SERVICES CLASHES PRIOR TO COMMENCEMENT OF TO KERB OR CARRIAGEWAY EDGE. ALL OTHER SIGNS TO BE TURNED AWAY BY 5°
CIVIL WORKS. CONTRACTOR TO IMMEDIATELY REPORT ANY DISCREPANCIES TO RECOR DEVELOPMENT HAS MET THE REQUIREMENTS OF THIS DECISION NOTICE AND ALL
FROM THE NORMAL TO APPROACHING HEADLIGHT.
AND AWAIT FORMAL DIRECTION PRIOR TO COMMENCING CIVIL WORKS. APPLICABLE LEGISLATION AT THE TIME OF CONSTRUCTION.
3. SIGN SUPPORTS
6. ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL BE
3.1. SLEEVED SIGNS SUPPORTS ARE TO BE PROVIDED IN ALL AREAS WHERE THEY ARE
GEOTECHNICAL NOTES
RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS, CONCRETE AREAS, 3. ALL WORKS MUST BE CARRIED OUT IN ACCORDANCE WITH THE RECOMMENDATIONS
IN A PAVED SURFACE.
GRAVEL AREAS, GRASSED AREAS AND ROAD PAVEMENTS. CONTAINED IN THE PROPOSED UNIT DEVELOPMENT REPORT PREPARED BY TECTONIC ON
4. LINEMARKING
7. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO THE 30th OF SEPTEMBER 2024, REF. 24265-001-REV0.
AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR REINSTATEMENT TO BE 4.1. REDUNDANT LINEMARKING IS TO BE GROUND OFF.
CARRIED OUT IMMEDIATELY TO THE SATISFACTION OF INFRASTRUCTURE 4.2. THERMOPLASTIC LINEMARKING TO BE USED FOR ALL CONCRETE. EARTHWORKS AND RETAINING WALLS NOTES
OWNER/MANAGER / AUTHORITY/COUNCIL. 1. ALL EARTHWORKS AND ASSOCIATED BATTERS/RETAINING STRUCTURES, BOTH ABOVE
JOINTING NOTES AND BELOW GROUND LEVEL, BOTH TEMPORARY AND PERMANENT, MUST BE CONTAINED
8. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL WORKPLACE ENTIRELY WITHIN THE SUBJECT SITE UNLESS WRITTEN PERMISSION FROM THE
HEALTH AND SAFETY REQUIREMENTS. RESPECTIVE LANDOWNER(S) IS PROVIDED TO COUNCIL. ALL EARTHWORKS MUST BE
1. ALL JOINTING AND CONCRETE TO BE IN ACCORDANCE WITH THE REQUIREMENTS OF UNDERTAKEN IN ACCORDANCE WITH THE PROVISIONS OF AUSTRALIAN STANDARD
9. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE PROXIMITY
AS3727.1:2016. AS3798: GUIDELINES ON EARTHWORKS FOR COMMERCIAL AND RESIDENTIAL
TO NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE, CONTRACTOR TO ALLOW IN
SCOPE OF WORKS TO PROVIDE ALL MEASURES NECESSARY TO ENSURE THE INTEGRITY 2. SAW CUT JOINTS MUST BE: DEVELOPMENTS.
OF EXISTING BOUNDARIES AND INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW 2.1. BETWEEN 41 AND 31 OF CONCRETE PAVEMENT DEPTHS. 2. WHERE THE DEVELOPMENT INVOLVES EXCAVATION OR FILLING OVER, OR ADJACENT TO,
VIBRATION EQUIPMENT, TRENCH SHORING ETC AS REQUIRED. 2.2. CLEARED OF ANY DEBRIS FROM THE CUTTING METHOD. DRAINAGE, WATER SUPPLY OR SEWERAGE INFRASTRUCTURE, ALL ACCESS CHAMBER
10. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THESE DRAWINGS, 2.3. PERFORMED WITHIN 6 TO 12 HOURS OF FINISHING CONCRETE POURS. SURFACE LEVELS MUST BE ADJUSTED TO PROVIDE A FREEBOARD OF 100MM ABOVE THE
THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN CONFIRMATION THAT 3. DOWELL BARS MUST BE INSTALLED EXACTLY 90° TO THE FACE OF JOINT TO ALLOW FINISHED GROUND SURFACE LEVEL.
WORKS CAN COMMENCE. EXPANSION AND CONTRACTION MOVEMENTS. 3. ALL RETAINING WALLS MUST BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH
11. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL CONSTRUCTED 4. JOINTING LAYOUT TO BE CONFIRMED BY SUPERINTENDANT PRIOR TO CONSTRUCTION THE PLANNING SCHEME AND MUST BE CERTIFIED BY AN RPEQ WHERE EXCEEDING 1.0M IN
WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT REQUIREMENTS. UNLESS COMMENCING. LAYOUT SHOULD AVOID ACUTE ANGLES IN THE CONCRETE SLAB AND HEIGHT. ALL RETAINING WALLS THAT ARE PUBLICLY ACCESSIBLE AND EXCEED 1.0M IN
OTHERWISE ADVISED BY RECOR CONTRACTOR TO NOTE COUNCILS ADAC AVOID MISMATCHED JOINTS. HEIGHT MUST BE FITTED WITH A COMMERCIAL GRADE SAFETY FENCE.
REQUIREMENTS.
5. JOINT SEALANTS WHERE USED MUST ADHERE TO SIDE OF JOINT FACES ONLY AND SHALL
12. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT NOT EXTEND ABOVE SIDES OF JOINTS ONTO THE SLAB SURFACE.
APPROVALS.
6. DOWEL BARS ARE TO BE
13. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL, LANDSCAPE AND
OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL CONSTRUCTION. 6.1. FOR 100MM THICK SLAB, 12MM Ø OF LENGTH 300MM AND SPACED AT 400MM
CENTRES
14. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION WORKS 6.2. FOR 125MM THICK SLAB, 16MM Ø OF LENGTH 350MM AND SPACED AT 300MM
COMMENCING ON SITE. CENTRES
15. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS AND 6.3. FOR 150MM THICK SLAB, 20MM Ø OF LENGTH 400MM AND SPACED AT 300MM
SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O. CENTRES
16. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING PROPERTIES AND
COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT OF ANY WORKS ON SITE. INSPECTIONS:
17. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED IN THE THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS BEFORE
APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO ENSURE ALL TREE ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO PROVIDE A MINIMUM
ROOTS AND STUMPS ARE COMPLETELY REMOVED AND BACKFILLED TO LEVEL 1 OF 72 HOURS NOTICE TO RECOR FOR REQUIRED INSPECTIONS. SHOULD THE
SUPERVISION. CONTRACTOR TO ALLOW TO MULCH ALL CLEARED VEGETATION AND CONTRACTOR FAIL TO REQUEST AN INSPECTION, THE CONTRACTOR WILL BE RESPONSIBLE
STOCKPILE ON SITE OR REMOVE FROM SITE AS DIRECTED. FOR ALL COSTS TO ALLOW FOR THE WORKS TO BE INSPECTED TO THE SATISFACTION OF
18. DRAWINGS TO BE READ IN CONJUNCTION WITH ARCHITECT, SURVEYOR, HYDRAULICS, RECOR. ANY INSPECTIONS THAT FAIL ARE TO BE RE-INSPECTED WITH ALL REINSPECTION
ETC. CONSULTANT AND CONTRACTOR DRAWINGS. COSTS TO BE PAID BY THE CONTRACTOR.
19. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY: ROAD a. PRESTART
OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS WITHIN COUNCIL b. EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT AND EROSION
ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS ASSOCIATED WITH CONTROL MEASURES UNSUITABLE GROUND
IMPLEMENTATION OF THE TMP.
c. SIDE AND CUT OFF DRAINS
20. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL AUTHORITY
APPROVALS RECEIVED FOR THE PROJECT AND IN ACCORDANCE WITH OPW APPROVALS d. STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL
BY COUNCIL. e. STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT
North Point Approved Project Address Sheet Title
E WHITMORE
RPEQ 31423
51 ELANDA STREET SUNSHINE BEACH QLD
GENERAL NOTES
For and on behalf of RECOR Pty Ltd.
Scale ENGINEERING + PROJECT MANAGEMENT Client Details Project Name Sheet Size
SUNSHINE COAST | BRISBANE | SYDNEY
B 26/09/25 ISSUE FOR OPW APPROVAL DP AY www.recorconsulting.com | ABN 89 647 469 707 ARCHEND PROPOSED MULTIPLE RESIDENCE A1
A 21/03/25 ISSUE FOR APPROVAL TVZ AY COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's client. This Project Number Sheet Number Revision
drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as 'Issued For Construction'
Rev Date Revision Description Drawn Check DO NOT SCALE, IF IN DOUBT ASK in the revision description. 20240127 002 B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REPS - Engineering Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.