Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2017-06-06 Services & Organisation Committee Agenda

of 94

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (20.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

BRANCH ACTIVITIES                          RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                          THE NEXT QUARTER
Continue implementation of the mobility       Further roll-out within the Parks &         Development of more detailed              Pathway       inspections     to   be
application across the organisation with        Natural Areas crews.                          pathway inspection programmes to            implemented       in   mobility   and
greater than 50% implementation of Civil                                                      complement asset condition and              supported with detailed reporting.
Operations (including Parks).                                                                 insurance compliance.                     Planning of mobility roadmap
                                                                                            Mobility roadmap for endorsement            outside of infrastructure department.
                                                                                              by the asset management steering
                                                                                              committee.
Develop process to reduce the number          Completion of the majority          of      Continue developing an in-house         Implement the assessment tool with
of traffic related CRM’s not completed          backlog traffic related CRM’s.                assessment tool to evaluate traffic       minimal backlog CRM’s going
within timeframes.                                                                            requests.                                 forward.
Business as Usual activities                  Capital works Executive and Project         Evaluation and recommendation of        Report to CWE and PCG’s on
                                                Control Groups continue along with            Kinmond Creek Road tenders                progress of Capital Works Program
                                                reporting      spreadsheet     and          Proposal for trial section of Main      Award the following:
                                                governance terms of reference for             Beach boardwalk design and                o Kinmond Creek Road, Eastern
                                                capital works management.                     construction (between Surf Club and          Branch     and    Sandy    Creek
                                                                                              Park Road).                                  reconstruction
                                                                                            Commence Hilton corridor upgrade        Commence works for:
                                                                                              design contract.                          o Thomas          Street     culvert
                                                                                            Assess Park Road Boardwalk                   reconstruction
                                                                                              tenders

Planning & Environment

Management of Flying Fox Issues               Subsidy scheme for residents                Implementing stage 2 of Sprinkler         Ongoing operation of sprinkler
                                                affected by flying fox in Wallace Park        system in Wallace Park                      system as needed
Draft Local Government Infrastructure         Desired standards of service for all        Plans for trunk infrastructure maps       Finalise schedule of works model
Plan                                            infrastructure networks reported and          and draft schedule of future works        Finalise LGIP documents and
                                                adopted by Council                            and costs for transport and                 extrinsic materials for reporting to
                                              Plans for trunk infrastructure maps           stormwater networks                         independent reviewer
                                                and draft schedule of works for             Progressive reports to be presented       First state interest review by DILGP
                                                parks and land for community                  to      Council     for    remaining
                                                facilities network reported and               infrastructure networks
                                                adopted by Council
Develop    Noosa   River   Management         Review of Noosa River Plan Current          Continue discussions with state           Future workshops with Council to
Strategy                                        Actions                                       agencies on Jury recommendations            address Jury recommendations and
                                                                                            Review and update Noosa River               community consultation
                                                                                              Plan



                                                                                                                                                              Page 89 of 94
Log in to download the original file

2017-06-06 Services & Organisation Committee Agenda(PDF, 19MB).pdf · 20.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.