PLANNING & ENVIRONMENT COMMITTEE MEETING MINUTES 11 MAY 2021
11. There must be no electrical reticulation system carrying electricity in excess of 24
volts beyond the revetment wall unless all switches and power outlets are
positioned above the 1%AEP flood level.
12. Lighting associated with the use must be designed, installed, operated, and
maintained in accordance with Section 3 of AS4282 Control of the Obtrusive
Effects of Outdoor Lighting.
13. Rock scour protection, wrapped in geotextile, extends from 750mm up to
approximately 5000mm from the face of the revetment wall in Noosa Waters. Piles
are to be:
a. Located clear of this rock protection where applicable; or alternatively
b. Where the scour protection extends beyond 750mm:
i. Prior to driving piles, the rocks are to be removed to expose the
geotextile and the geotextile cut neatly to allow it to be turned back.
During pile driving, care is to be taken to ensure the geotextile is not
damaged. At the completion of pile driving, the fabric is to be turned
down around the pile and the rocks replaced around the piles
14. The jetty is to be used for private purposes only with no commercial operations to
be undertaken.
15. Boat repair activities are not permitted on site.
16. Wastewater and sullage must only be disposed of at approved pumpout facilities.
17. The mooring facility must not be utilised for live-aboard purposes including short
term accommodation.
18. Any construction and post construction activity is not to impact on the condition of
the waterway, and is to be conducted so as not to breach the Environmental
Protection Act EPA (1994) and the Environmental Protection (Water) Policy 2009.
19. Certification by a Registered Professional Engineer of Queensland that states that
the jetty is constructed in accordance with best practice methods and is structurally
sound must be submitted to Council. This certification must be submitted to Council
within three (3) months of the completion of the works. A final inspection and
approval of the structure by Council’s Inspector is also required. Please contact
Council’s Development Assessment Branch on 5329 6500 to arrange the
inspection.
20. After completion, the proposed works must be maintained in a sound state of repair
in accordance with the approved plans
Performance Bond
21. Security in the form of a cash bond or trading bank guarantee to the sum of $2500
must be submitted to Council, to secure performance of all conditions of this
approval, prior to commencement of works. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less any
costs incurred by Council in respect of enforcing performance of this permit.
Council reserves the right to call upon the bond or guaranteed sum to effect
compliance with conditions.
Carried unanimously.
Page 4 of 5