Specific Outcomes Probable solutions (if code assessable) c 3
Management of Operations No Solution Provided o
093 On-site drainage is designed, constructed and oa
maintained to:
a) _ minimise erosion: S
b) avoid pollution of groundwater and surface oO
water, So
c) provide opportunities to conserve and reuse = <
water on the site: and ao
dq) prevent additional flooding or inundation. ec
094 Noise, vibration and dust emissions from the
development are managed to acceptable levels.
095 Operations minimise lighting impacts on roads
and other properties
O96 Public access to the site is managed
appropriately
097 Development is designed in a manner which
will not compromise the stability. safety or operation
of infrastructure.
098 Development is designed and managed to
minimise the risk and impact of any accidental spills
and / or releases of chemicals and other matenals
that may contaminate soil. stormwater. groundwater
and/or air.
Landscaping No Solution Provided
099 Landscaping complements biodiversity values
of the adjoining area.
Hours of Operation No solution provided
0100 Extractive industry activities occurs at times
that will not result in disturbance at surrounding
uses.
Traffic and Transport
0101 The transportation of materials is undertaken
in a way which:
a) maintains the safety and efficiency of the
roads comprising the transport route: and
b) minimises amenity impacts on premises
within the transport routes separation area.
42See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.