Skip to the record
Accept no substitutions.

Original source · versioned page text

2016-07-12 - Item 13 - Att 1 - Extractive Resources and Mineral Planning Study 2016

of 45

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

42

Column 1                                         column 2
                Specific Outcomes                      Probable solutions (if code assessable)         c 3
 Management of Operations                             No Solution Provided                             o
 093 On-site drainage is designed, constructed and                                                    oa
 maintained to:
 a) _ minimise erosion:                                                                                S
 b)   avoid pollution of groundwater and surface                                                       oO
      water,                                                                                           So
 c)   provide opportunities to conserve and reuse                                                     = <
      water on the site: and                                                                            ao
 dq)  prevent additional flooding or inundation.                                                       ec
 094 Noise, vibration and dust emissions from the
 development are managed to acceptable levels.
 095 Operations minimise lighting impacts on roads
 and other properties
 O96 Public access to the site is managed
 appropriately
 097 Development is designed in a manner which
 will not compromise the stability. safety or operation
 of infrastructure.

 098 Development is designed and managed to
 minimise the risk and impact of any accidental spills
 and / or releases of chemicals and other matenals
 that may contaminate soil. stormwater. groundwater
and/or air.
 Landscaping                                          No Solution Provided
 099 Landscaping complements biodiversity values
 of the adjoining area.
 Hours of Operation                                   No solution provided
 0100 Extractive industry activities occurs at times
 that will not result in disturbance at surrounding
 uses.

 Traffic and Transport
 0101 The transportation of materials is undertaken
 in a way which:
 a)   maintains the safety and efficiency of the
      roads comprising the transport route: and
 b)   minimises amenity impacts on premises
      within the transport routes separation area.

                                                                                                              42
Log in to download the original file

2016-07-12 - Item 13 - Att 1 - Extractive Resources and Mineral Planning Study 2016(PDF, 4MB).pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.