Original source · versioned page text
2016-07-12 - Item 13 - Att 1 - Extractive Resources and Mineral Planning Study 2016
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
43
” Column 1 column 2
c 5 Specific Outcomes Probable solutions (if code assessable)
& Rehabilitation No solution provided
Qo 0102 Rehabilitation of the site, over the life of the
o “|| project and on its completion:
wn a) _ provides for progressive/ staged rehabilitation
° works:
Ss b) includes appropriate clean-up works (taking
particular account of areas of possible soil or
2 water contamination):
~K c) results in a stable final landform;
dg) _ provide suitable drainage and hydraulic
conditions; and
€) achieves a suitable degree of revegetation
consistent with potential post-extraction land
uses.
0103 Rehabilitation allows for suitable use of any
water storage created through the extraction
process. having regard to water quality, hydraulic
conditions, land form and vegetation.
860704Resource extraction activities in proximity | No solution provided
to the Noosa River system only occur where—
| a@) there is a clear demonstrated need;
b) no feasible and prudent alternatives are
available; and
|| c) it can be demonstrated that the intrinsic
natural values and resources of the river
system can be managed and protected in an
ecologically sustainable manner.
| £820705industrial business Type 3 Extractive No solution provided
are designed, located and operated to ensure—
| @) haulage routes associated with extractive
resources—
| i are located on roads where the haulage
route will minimise adverse impacts on
residential and urban residential
amenity;
| ii are located on roads which are of
adequate construction and which may
be upgraded as part of the utilisation of
the extractive resource; and
| iii are adequately maintained as a part of
the utilisation of the extractive resource;
and
| b) the utilisation of any extractive resource does
not result in adverse visual impacts from major
roads; and
| c) the rehabilitation of extractive industry sites,
prior to or in conjunction with land use changes
on the site of the resources or within buffers to
the resource.
43See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.