Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Attachment 5 - Servicability Report · MCU23/0078

of 66

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (21.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 7, section 1. The text section number identifies this passage in the reader.

                                         Figure 2: Noosa Shire Council Interactive Flood Map


      EXISTING AND PROPOSED CIVIL WORKS AND INFRASTRUCTURE

3.1     STORMWATER

3.1.1   Existing Infrastructure

        A Before You Dig investigation, detailed survey, and examination of as-constructed documentation for the surrounding
        roadways has been completed of the site and its surrounding area. The following stormwater infrastructure was noted:

            −   An existing 1200mm x 600mm box culvert and temporary field inlet is located at the south-west corner of the Lot
                3 which conveys flows below Hofmann Drive and into Eenie Creek to the south of the development site;

            −   An existing 375mm dia. stormwater pipe with multiple gully pits is located along the southern half of the internal
                access roadway which also conveys flows along Hofmann Drive and into Eenie Creek;

            −   An existing 750mm dia. stormwater pipe with multiple gully pits is located along the northern half of the internal
                access roadway which conveys flows to the north into the upstream end of the environmental zone and natural
                drainage channel bounding Lot 3;

            −   A 4-cell 1200mm x 600mm box culvert exists below Hofmann Drive which conveys flows from the environmental
                zone and natural drainage channel below Hofmann Drive into Eenie Creek to the south; and

            −   The stormwater infrastructure within the private access roadways have built for a fully developed catchment.


        As-constructed Drawings of the existing stormwater infrastructure and detailed survey can be found in Appendix C.




                                                   www.bornhorstward.com.au                                                 Page 4

Used in these records

About this file

File size
21.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Servicability Report.pdf · 21.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.