Skip to the record
Every meeting, every word.

Council archive · source document

Attachment 5 - Servicability Report · MCU23/0078

of 66

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (21.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 8, section 1. The text section number identifies this passage in the reader.

3.1.2   Proposed Infrastructure

        The following points outline the proposed stormwater infrastructure for the development site:

            −    Minor events from within Lot 3 will be conveyed by an internal stormwater piped network to the existing 1200mm
                 x 600mm box culvert at the south-west corner of the development site;

            −    Minor events from within Lot 7 will be conveyed by an internal stormwater piped network to the existing gully pits
                 along the private access roadway along the western frontage of the development site;

            −    Major events will be conveyed via overland flow towards and onto the surrounding private access roadways and
                 environmental zones as per existing conditions;

            −    As there will be an increase to the impervious area as a result of the proposed development, there will be an increase
                 to peak stormwater discharge rates from the development site. Based on this, stormwater detention measures are
                 required, and four below-ground stormwater detention tanks are proposed across both Lot 3 and Lot 7; and

            −    Considering the development works area is greater than 2500m2, stormwater quality treatment measures are
                 required for the proposed development as per the State Planning Policy and Noosa Shire Council Planning Scheme.
                 Treatment is proposed within multiple bio-retention basins across both development sites.


        Refer to Bornhorst and Ward’s Stormwater Management Plan for further details. Refer to the engineering drawings in
        Appendix B for further information.


3.2     EARTHWORKS

        Earthworks will be required to construct building pads, grade surface carparks and for basement excavation. A detailed
        earthworks plan will be prepared as a part of the detailed design operational works lodgement. A Preliminary Earthworks
        Plan has been provided in Appendix B.




                         Figure 3: Noosa Shire Council Potential and Actual Acid Sulphate Soils Overlay Map




                                                    www.bornhorstward.com.au                                                   Page 5

Used in these records

About this file

File size
21.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Servicability Report.pdf · 21.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.