                  Specific Outcomes                                        Solutions
       winter;
b)     minimise solar access to the east and west
       in the summer;
c)     maximise access to any prevailing summer
       breezes; and
d)     minimise exposure to prevailing winter
       winds.
I nfrastructu re
015 Each lot is capable of being serviced by             All lots have available connections to
appropriate levels of-                                   power supply and telecommunications
a)    water supply;                                      services and available areas that can be
b)    reticulated sewerage;                              used for stormwater and effluent disposal.
c)    stormwater drainage;
d)    power supply; and
e)    telecommunications;
AND
016 The design and provision of public services
and utilities, including sewerage, water,
electricity, street lighting and telecommunication
services-
a)     meets the needs of users;
b)     ensures health,   safety and convenience of
       the community;
c)     protects the natural environmental values
       of the site and surrounds, including visual
       amenity and native vegetation;
d)     are cost effective over their life   cycle;
e)     minimises adverse impacts to the
       environment (including the amenity of the
       local area) in the short and long term; and
f)     ensures that the existing systems are
       upgraded or relocated to be capable of
       supporting the proposed development;

AND


017 Essential public utilities are available and
maintain their function during flood events up to a
1 % AEP (1:1 00 year ARI) flood event.

Electricity supply infrastructure                        There are no major pieces of electrical
018 Uses and works maintain a safe distance              infrastructure located near the site.
from electrical infrastructure including
substations, overhead power lines, power poles
and transformers.


Earthworks and stormwater management
019 Stormwater run-off is managed so as not to           Not applicable.
cause any adverse      impacts on the built or natural
 environment including changes in quality,
_g_uantity or location of stormwater discharges.
 020 Filling or excavation only occurs where it          No filling or excavation is intended.
 does not adversely impact on-
 a)     watercourses, drainage lines and wetlands;
      or

b)    vegetation on land identified on Biodiversity
      Overlay Maps OM1.1-0M9.1; or
c)    water levels on properties elsewhere.




                                                     7

Used in these records

About this file

File size
11.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 2 Report and Plans - REC13_0060.pdf · 11.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.