    With regard to those lots located within the area over which the Noosa Plan is the relevant Planning Scheme
    (Lot 2 on SP179590, Lot 53 on SP163571, Lot 2 on RP46782, Lot 2 on RP160983, and Lot 1667 on M37772).
    The documentation relating to bushfire hazard assessment has not responded to the relevant Codes in the
    Noosa Plan.

    48      Demonstrate how the application meets the overall outcomes of the Natural Hazards Overlays Code.

Response:

Natural Hazard: Landslide and Flooding Overlay
The overall outcomes are the purpose of the Natural Hazards Overlays Code.
The overall outcomes sought from the Natural Hazards Overlays Code are—
a) development in areas at risk from natural hazards is compatible with the nature of the natural hazard;
b) the risk to people, property and the natural environment from natural hazards is minimised;
c) development does not result in a material increase in the extent or severity of natural hazards; and
d) for acid sulfate areas—the generation or release of acid and associated metal contaminants into the environment
is avoided

The amended Bushfire Assessment Report included within Attachment 9 details the potential fire risks of the site
and provides an assessment of bushfire hazard mitigation measures that have been incorporated into the design of
the Noosa on Weyba Locality Plan to ensure that people and property are not placed at an unacceptable risk of
harm in the event of a bushfire.

The proposed Noosa on Weyba development would increase the number of people living and working within an
area that contains substantial reserves of bushland that present a hazard to human health and property in the event
of a bushfire. As such it is a requirement of SPP 1/03 that the Noosa on Weyba development make appropriate
provision for bushfire hazard mitigation and management measures.

Due to the above, the proposed Noosa on Weyba Preliminary Approval Development will incorporate the following
recommendations made in the amended Bushfire Investigative Report regarding the appropriate provisions for the
mitigation and management of bushfire hazards:
     the establishment of appropriate building setbacks from areas of hazardous vegetation within and external
         to the site;
     a reticulated water supply with the capacity to service the bushfire and general fire fighting requirements
         for the proposed development;
     upgrading of the external road network to provide enhanced access to the Noosa on Weyba site locality for
         the deployment of fire management personnel and equipment, and evacuation of residents if required, in
         response to a bushfire event;
     an appropriate designed internal network of formed roadways and fire maintenance trails that will enable
         for the safe and efficient deployment of fire management personnel and equipment;
     an appropriate system of firebreaks comprised of roadways, maintenance trails and managed vegetation
         zones to separate hazardous vegetation from potential building sites; and
     ongoing maintenance and management of on-site an assessment of the post-development bushfire hazard
         levels that would exist within the Noosa on Weyba locality, completed in accordance with the bushfire
         hazard assessment guidelines provided for in State Planning Policy 1/03 Guideline – Mitigating the Adverse
         Impacts of Flood, Bushfire and Landslide

Regarding flood impact the proposed development of Noosa on Weyba has been shown through TUFLOW
modelling (see Section 3 of the amended Flood Study included in Attachment 13) to:
     have no adverse impacts on flood levels and flows for surrounding properties for local and regional flood
        events;
     reduce the 100 year ARI event the peak flood level around Lake Entrance Boulevard due to flow attenuation
        being proposed within the site;
     provide 100 year ARI trafficability for all proposed and upgraded roads;
     provide PMF evacuation routes for all areas of the site; and
     improve flood access for neighbouring properties.
                                                        40

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Council Lake Weyba Information Response 28-10-13_FINAL.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.