The flood levels used to set the development levels for the site include the potential impact of climate
change. The proposed filling within the site will reduce available flood storage, although compared to the
available storage in Lake Weyba and the surrounding floodplain, the reduction is minimal. Flood modelling
has shown that the impact of the reduced flood storage is contained within the site. Dense revegetation of
the western drainage channel is considered to be achievable with acceptable flood impacts for the site and
surrounding properties should this be desirable.
Based upon the specialist investigations it is concluded that the proposal complies with the requirements
of the Natural Hazards Landslide and Flooding Overlay.
49 Provide a comprehensive response to the Natural Hazards Overlays Code Probable Solutions and, if
these cannot be met, provide a comprehensive response to the Specific Solutions.
Response:
Section 5.1 of the Noosa on Weyba amended Bushfire Assessment Report (Attachment 9) provides an assessment
of the proposed development against the requirements of the Noosa Planning Scheme Natural Hazards Overlays
Code.
50 Provide a detailed Fire Management Plan that adequately responds to the management of
bushfire hazards and will mitigate the bushfire hazards within the site, should the Applicant be
able to effectively respond to the Natural Hazard Overlays Code.
Response:
The Noosa on Weyba amended Bushfire Assessment Report (Attachment 9) provides the relevant information
concerning Bushfire Management as required by Noosa Planning Scheme Policy 1 which states that Council
may require:
a) A site specific assessment of bushfire risk prepared in accordance with Appendix 3 of the State Planning
Policy 1/03 Guideline: Mitigating the Adverse Impacts of Flood, Bushfire and Landslide; and
b) A Bushfire Management Plan prepared in accordance with Appendix 8 of the State Planning Policy 1/03
Guideline: Mitigating the Adverse Impacts of Flood, Bushfire and Landslide.
It is important to recognised that the current development application does not seek approval for a particular
development layout. The indicative development layout considered in the Noosa on Weyba amended Bushfire
Assessment Report (Attachment 15) is used for the purpose of demonstrating one potential means by which the
development of the site could proceed whilst meeting relevant planning requirements. As noted in the Noosa
on Weyba amended Bushfire Assessment Report, more detailed Bushfire Management Plans will be required to
support development applications that seek approval for a particular development layout within a particular
precinct. This approach is consistent with SPP 1/03 Appendix 8 – Undertaking a Bushfire Management Plan
which recognises that “If the application must be followed by another application before works can commence
(e.g. a Material Change of Use application that must be followed by a Reconfiguration of a Lot application), then
matters of detail could be dealt with at the later application stage.”
Information Required
With respect to Lot 11 on SP250714, over which the Maroochy Plan is the relevant Planning Scheme,
the documentation relating to bushfire hazard assessment has not responded to the relevant Code in the
Maroochy Plan.
51 Demonstrate how the application meets the overall outcomes of 2.1.6 Code for Development in
Bushfire Hazard Areas.
41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Council Lake Weyba Information Response 28-10-13_FINALRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.