Council Lake Weyba Information Response 28-10-13_FINAL · MCU12/0208
Density, Typology and Movements plan updated
Supporting diagrams and text updated where necessary
Precinct Four
Updated design concept to reflect revised access to development precincts
Density, Typology and Movements plan updated
Supporting diagrams and text updated where necessary
Change 3 - Level of Assessment Table
Further to all information requests received, a number of changes to the Specific Solutions and Probable Solutions
within the Noosa on Weyba Locality Code have been amended in response to items specifically included within the
SCRC and Referral Agencies Information Requests.
Maps, Figures and Diagrams have also been amended in response to items specifically included within the SCRC and
Referral Agencies Information Requests.
The following points note the changes made within the locality code document;
Amendments to the Level of Assessment within the Detached Housing Code and Attached Housing Code to
alter the level of assessment on a lot burdened by an easement in favour of Energex.
Amendments to O8 and O12 of the Noosa on Weyba Locality Code to satisfy information request item 6
from SCRC.
A copy of the Amended Noosa on Weyba Locality Plan has been included as Attachment 1 for your reference.
Change 4 – Specialist Reporting
In response to all issues raised by SCRC and the relevant referral agencies, specialist reports have been amended
and attached. Each amended report has been re-issued as a complete document to ensure all relevant material can
easily be reviewed and assessed. The noted changes and responses to relevant information request items are
clearly noted within each amended document.
Comments on Process
We note that these changes do not stop IDAS as the changes are either a minor change under section 353 or a
change which is in response to an Information Request under s.354.
We also note that Council must give a copy of the Notice under section 352 to the entities identified in that section.
PART 2 – APPLICANT’S RESPONSE TO COUNCIL INFORMATION
REQUEST DATED 28 FEBRUARY 2013:
EXECUTIVE SUMMARY
Further to all information requests received the Noosa on Weyba Consulting team have spent some 8 months and
over $1,000,000.00 to ensure that the best outcome for this project, the site and the environment can be achieved.
Following a range of meetings to discuss specific items requested, a full range of amended specialist reports have
been prepared which have considered and concluded favourably the changes to the Noosa on Weyba proposal. A
number of major benefits to Council have resulted from the information response review and are summarised as
follows;
The applicant has recognised the councils concerns over the impact of the proposed project on old growth
trees, especially in the road reserves, and conducted a detailed on site survey of the trees in question and
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Council Lake Weyba Information Response 28-10-13_FINALRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.