plotted their numerous locations.
This survey has led to the applicant reconsidering the proposed external road system which has been
reviewed in extensive detail in an Access Options report which is included in this response and which has
produced an outcome that best balances the requirements for traffic design, environmental protection and
infrastructure costs.
The compilation of the Access Option report has led the project team to deleting the majority of the
previously proposed road construction in Hollett Road which has in turn caused a relocation of parts of the
main road access system now to be bought into the subject site boundaries. This is noted on the A1 Draft
Concept Master Plan.
The removal of major sections of Hollett Road construction and the realignment of the internal road system
has allowed the applicant to delete two major previously proposed floodway crossings of Kyser Creek at the
rear of Lot 11 and this has produced a superior flood and environmental outcome.
The Access Options report is also supported by a revised flood study which has now accommodated
councils regional flood concerns plus the deletion of roadwork’s to Hollett Road east and the changes to Lot
11, whilst also assessing the deletion of the proposed roadwork’s and flood path culverts in Hollett Road
west.
The deletion of the majority of the proposed Hollett Road construction, coupled with our plans to maintain
the previously proposed amount of compensatory planting on site, has led to this proposal delivering
compensatory plating to a ratio of 180% of the normally required scope.
This Information Request response also details the additional detailed fauna threatened species
investigations that have now been undertaken on site at the request of council, which have produced a
result which remains environmentally supportive of the project.
The applicant has also accepted the Council’s requests and conducted Aboriginal Heritage and Mosquito &
Midge assessments, and this Request for Further Information response contains the appropriate specialist
reports which support the proposed project.
Council raised concerns about the affordability of the proposed environmental levy, which is an integral
component of the proposed project, therefore the applicant has undertaken an extensive assessment
through our environmental and body corporate specialists which has produced a detailed report on the
likely levies that future residents would have to pay. This report forms part of our RFI response and shows
that the proposed Community Title Scheme structure, including the environmental levy, is sensible and
affordable.
Concerns were also raised by council over whether there is a real market demand for the proposed scheme
and whether demand exists for Age Care and Retirement Living dwellings. The applicant further engaged
our socioeconomic specialist RPS Group who has produced an expanded in depth analysis of the demand
that exists for this project, and a copy of their expanded report forms part of this Information Request
response.
Further that same specialist expanded their analysis of the impact on social infrastructure in the locality
and have proven that this project will not exceed the currently available social infrastructure.
PLANNING ASSESSMENT
Issue
Lake Weyba and its surrounds are known areas of Aboriginal cultural significance and contain important
sites and artifacts.
Information Required
1 Provide a detailed Cultural Heritage Assessment of the site.
Response:
Please refer to Attachment 2 for the Cultural Heritage Due Diligence Assessment of the site prepared by Everick
Heritage Consultants Pty Ltd.
6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Council Lake Weyba Information Response 28-10-13_FINALRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.