Council archive · source document
Council Lake Weyba Information Response 28-10-13_FINAL · MCU12/0208
relocated so that it lies outside of the revised erosion prone area.
A pedestrian track and fire trail will still be provided along the northern boundary of Lot 11 in the Hollett Road
reserve. The existing track in this area is a gravel road with small pipe culverts that restrict tidal flows. The
upgraded pedestrian track will replace the culverts with larger ones and so reduce the restriction to tidal flows
in this area. This will result in improvement to the coastal wetland area located upstream of the track.
Section 3.2.2 (2) of the Coastal Protection SPRP states:
“Where buildings and structures exist within an erosion prone area, any future development of the land must
not be at a greater intensity than the existing development unless it can be clearly demonstrated that the
development would not compromise coastal management outcomes and principles.”
It is considered that the proposed pedestrian track and fire trail is not an intensification of the existing use.
Regardless of this, the proposed crossing of the track will improve the tidal flushing in the area and improve
coastal management outcomes.
Stormwater Quality
Issues
The Stormwater Management Plan (Cardno (Qld) Pty Ltd, Stormwater Management Plan, Job Ref. 5101/19-
03) has been evaluated and the following are the concerns that need to be addressed prior to any approval.
There are concerns regarding the location of bio-retention devices in the proposed buffer to
Lake Weyba on lot 11 where 10 metres of the proposed 50 metre wide buffer will be used
for these devices. This also applies to other areas associated with the proposal where bio-
retention devices are proposed to be located in rehabilitated waterway buffer and open space
areas.
Response:
The role that elements such as bio-retention basins and swales play in increasing the effectiveness of
wetland buffers is specifically recognised in the Queensland Wetland Buffer Planning Guideline (DERM,
2011) and other relevant planning guidelines. The location of these elements has been situated to ensure
that they do not impact on areas of ecological significance. As stated in the amended Stormwater
Management Plan (see Attachment 16) the proposed lake buffer width is 40 metres and the stormwater
treatment zone is an additional 10 metres. Existing trees within this zone will not be removed. All
stormwater treatment devices will be located outside of the 100 year ARI extent of inundation. The
development plans have been amended to ensure that the proposed stormwater treatment devices within
the development footprint.
All stormwater treatment devices will be located outside of the 100 year ARI extent of inundation. The
development plans have been amended to ensure that the proposed stormwater treatment devices within
the development footprint.
MUSIC modelling has been carried out on the assumption that rainwater storage tanks will
be installed onsite. This may be the intention at this point in time however State Government is
amending the QDC to remove the mandatory requirement for these tanks. Furthermore, the
Government may not allow local authorities to pursue this requirement through their planning
instruments. It is envisaged that as a minimum, the local authority requiring storage tanks for a
proposed development will need to at least justify this requirement. MUSIC modelling therefore
needs to be carried out based on the assumption that no rainwater storage tanks will be installed
on each lot.
Response:
58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Council Lake Weyba Information Response 28-10-13_FINALRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.