The Cultural Heritage Due Diligence Assessment found that no historic cultural heritage constraints were
identified during this assessment. It is unlikely that any significant historic cultural heritage constraints will
impact on the development potential of the Project Area.
Future heritage assessment works as part of a future development application may be conditioned by Council.
However, it is anticipated that in the event that Council did require such works, they would be minimal.
Further, the desktop research undertaken prior to the site inspection did not reveal any known Aboriginal
heritage within the project Area. Preliminary archaeological modelling and the archaeological site inspection
identified a range of landscape features within the Project Area that have a low or moderate potential to contain
Aboriginal Heritage. No areas were identified that are considered of high risk, such that levels of cut and fill or
Lot layouts would require altering.
There have also been no intangible (non-physical) heritage places identified within the Project Area. The
potential for these places to exist within the Project Area cannot be ruled out, and can only be established
through consultation with the Aboriginal party (Gubbi Gubbi People #2). Lake Weyba in particular may have
places of intangible heritage significance. Given the Projects setback from the Lake, it seems that the potential
for impacting on any intangible significance associated with the Lake is low.
Information Required
2 Demonstrate evidence of active engagement with the Aboriginal Traditional Owners of the land and
effective identification and management of any Aboriginal cultural heritage deemed significant by
the Traditional Owners has been undertaken.
Response:
Everick Heritage Consultants Pty Ltd have confirmed that discussions with traditional owners will be undertaken
as part of further approvals required for the site. The current application relates to a Preliminary Approval and
as such no works are proposed onsite.
It is logical to engage in meaningful discussions once further applications are submitted to Council and an
understanding of works is known through detailed design.
Formal discussions are considered premature as part of any Preliminary Approval Assessment.
Issue
The Planning Report lists 34 grounds to support the proposal, including many extraneous matters.
Information Required
3 Provide summary grounds of no more than 10 items that clearly articulate the overarching
planning grounds that justify the proposal for out-of-centre development and the expansion of
Noosa‘s urban footprint.
Response:
It is considered that all 34 items listed within the Town Planning Report to support the proposal, are in accordance
with Section 329(1)(b) of the SPA 2009. Notwithstanding this, a consolidated list of 10 items which justify the
proposed out-of-centre development and expansion of Noosa’s Urban Footprint has been provided as follows:
Biodiversity Development Offset Area – expanded Noosa National Park benefits.
(1) In September 2007, the former Noosa Shire boundary (the Noosa District) was designated as a biosphere
region by the United Nations Educational, Scientific and Cultural Organisation’s (UNESCO) Man and the
7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Council Lake Weyba Information Response 28-10-13_FINALRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.