10. A Construction Management Plan must be submitted to Council at least 5 working days
prior to the pre-start meeting and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction
ii. Maintenance of safe pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased
iii. Proposed fencing to the site during the construction phase of the
development
iv. Adequate parking arrangements for construction workers
v. No queuing of trucks is permitted on residential streets, especially prior to
7.00am. Further parked trucks must have engines turned off
b. Works programme identifying key components of the works and their respective
durations
c. Establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic and services and other relevant issues
d. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
During Construction
11. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets
must be repaired immediately where it creates a hazard to the community. In
circumstances where the damage does not create a hazard to the community, it must
be repaired immediately on completion of the works associated with the development.
12. All works must be supervised by a Registered Professional Engineer of Queensland
(RPEQ) who is independent of the Developer and Principal Contractor, and they must
certify that all works conform to the permit.
13. Safe pedestrian access on all streets in the vicinity of the development must be
maintained at all times. Should footpath/road closures be necessary to carry out
construction works, Council must be notified prior to the proposed closure and all
requirements complied with.
14. All structures associated with the boardwalk must be constructed wholly within the
approved area.
15. Structures must be designed and constructed such that they are free standing within
the waterway and are not connected to or behind the revetment wall or rock wall.
16. All structures must have no detrimental effects on stormwater drains and/or
easements.
17. Lighting associated with the use must be designed, installed, operated, and maintained
in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor
Lighting.
Page 4 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.