GENERAL COMMITTEE MEETING                                                    18 SEPTEMBER 2017


    18.   Boat repair activities are not permitted on site.
    19.   Wastewater and sullage must only be disposed of at approved pumpout facilities.
    20.   Any mooring facility must not be utilised for live-aboard purposes.
    21.   Any construction and post construction activity is not to impact on the condition of the
          waterway, and is to be conducted so as not to breach the Environmental Protection Act
          EPA (1994) and the Environmental Protection (Water) Policy 2009.
    22.   Certification by a Registered Professional Engineer of Queensland that states that the
          boardwalk is constructed in accordance with best practice methods and is structurally
          sound must be submitted to Council prior to the return of any bond monies held by
          Council. This certification must be submitted to Council within three (3) months of the
          completion of the works. A final inspection and approval of the structure by Council’s
          Inspector is also required. Please contact Council’s Planning Assessment Section
          (Development Audit & Response Officer 0428738563) to arrange the inspection.
    23.   This approval lapses where the construction of the boardwalk has not commenced
          within two (2) years of the date of issue of the approval, unless application is made and
          approved by Council for an extension.
          Environment
    24.   Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994)
          must not be released from the site or to waters within the site, or be likely to be released
          should rainfall occur, unless all reasonable and practicable measures are taken to
          prevent or minimise the release and concentration of contamination.
          Damage to Services and Assets
    25.   Any damage caused to existing services and assets as a result of the development
          works must be repaired at no cost to the asset owner at the following times:
          a.    where the damage would cause a hazard to pedestrian or vehicle safety,
                immediately; or
          b.    where otherwise, upon completion of the works associated with the development.
          Any repair work which proposes to alter the alignment or level of existing services and
          assets must first be referred to the relevant service authority for approval.
          After Construction
    26.   After completion, the proposed works must be maintained in a sound state of repair in
          accordance with the approved plans.
    27.   The approval of the development does not approve or authorise any use of the
          boardwalk for commercial purposes including but not limited to outdoor dining, wedding
          ceremonies/receptions, markets, display or storage of goods etc.
    28.   The balustrading shown on the approved plans must be constructed and maintained
          at all times to prevent and discourage adjacent tenancies encroaching on to the deck.
    29.   The deck must be unroofed, with no umbrellas, sails or the like erected or constructed.
    30.   The deck must be available to the public for recreational use including fishing.
                                                                                            Carried.




                                                                                         Page 5 of 7
Log in to download the original file

2017-09-18 General Committee Meeting Notes(PDF, 371KB).pdf · 380 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.