Council archive · source document
Appendix E - Stormwater Management Plan · MCU22/0140
Plans and drawings: the text below has words only, no drawings.
ingeniir EXECUTIVE SUMMARY Ingeniir Pty Ltd (Ingeniir) have been engaged by Robyn Kildey to produce this Stormwater Management Plan (SMP) in support of the Material Change of Use application for the Proposed Duplexes at 7 Ruby Street Cooroy 4563, Lot 616 on C56014. This report is comprised of stormwater quantity and quality assessments. The quantity assessment is undertaken to confirm a ‘non-worsening’ discharge of peak flow from the developed site. The quality assessment is undertaken to determine the required stormwater treatment measures to be implemented on site to comply with Local and State Authority requirements. Stormwater Quantity Calculations consider storm events up to and including the 1% AEP storm event. The purpose is to ensure that the existing infrastructure and/or downstream properties are not adversely affected by the proposed development. The stormwater quantity assessment determined that a measurable increase to the impervious area will occur due to the proposed development which would result in an increase to peak discharge rates if no flow mitigation were implemented. On-site detention measures are proposed for this development to mitigate stormwater flows for the development. Currently no quality stormwater management measures are in place for the existing subject site. As the proposed development area is less than 2500m2; best-management practice for stormwater treatment measures are to be implemented on site in accordance with current Industry Best Practice, WSUD Engineering Guidelines and State and Local Stormwater Quality Objectives. All relevant standards and guidelines are addressed in this Stormwater Management Plan including; criteria from the Queensland Urban Stormwater Quality Planning Guidelines (2010), Queensland Urban Drainage Manual (QUDM) and the Australian Rainfall and Runoff Guidelines. Ingeniir Pty Ltd | 215101-SMP-01 ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187 Page 3 | 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file