Skip to the record
The gold standard in government transparency.

Council archive · source document

Appendix E - Stormwater Management Plan · MCU22/0140

of 29

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                           ingeniir

EXECUTIVE SUMMARY

Ingeniir Pty Ltd (Ingeniir) have been engaged by Robyn Kildey to produce this Stormwater Management Plan
(SMP) in support of the Material Change of Use application for the Proposed Duplexes at 7 Ruby Street
Cooroy 4563, Lot 616 on C56014.

This report is comprised of stormwater quantity and quality assessments. The quantity assessment is
undertaken to confirm a ‘non-worsening’ discharge of peak flow from the developed site. The quality
assessment is undertaken to determine the required stormwater treatment measures to be implemented on
site to comply with Local and State Authority requirements.

Stormwater Quantity Calculations consider storm events up to and including the 1% AEP storm event. The
purpose is to ensure that the existing infrastructure and/or downstream properties are not adversely
affected by the proposed development.

The stormwater quantity assessment determined that a measurable increase to the impervious area will
occur due to the proposed development which would result in an increase to peak discharge rates if no flow
mitigation were implemented. On-site detention measures are proposed for this development to mitigate
stormwater flows for the development.

Currently no quality stormwater management measures are in place for the existing subject site. As the
proposed development area is less than 2500m2; best-management practice for stormwater treatment
measures are to be implemented on site in accordance with current Industry Best Practice, WSUD Engineering
Guidelines and State and Local Stormwater Quality Objectives.

All relevant standards and guidelines are addressed in this Stormwater Management Plan including;
criteria from the Queensland Urban Stormwater Quality Planning Guidelines (2010), Queensland Urban
Drainage Manual (QUDM) and the Australian Rainfall and Runoff Guidelines.




                                              Ingeniir Pty Ltd | 215101-SMP-01
                ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                         Page 3 | 14

Used in these records

About this file

File size
2.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E - Stormwater Management Plan.pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.