Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Appendix E - Stormwater Management Plan · MCU22/0140

of 29

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                           ingeniir

1.    INTRODUCTION

Ingeniir Pty Ltd (Ingeniir) have been engaged by Robyn Kildey to produce this Stormwater Management Plan
in relation to the Proposed Duplexes Development at 7 Ruby Street Cooroy 4563, Lot 616 on C56014.

There are no existing approvals over the allotment.


2.    EXISTING SITE CONDITIONS
The site is legally described as Lot 616 on C56014, with an allotment area of 1012m2. The site is located within
the Noosa Shire Council local government area.




                                                                     SITE




                                                  Plate 1: Site Locality



The site currently has an existing residential dwelling, sheds and driveway on site. The site elevation ranges
from approximately 107m in the rear right (North-East) to 169.4m at the front left (South-West) of the
allotment. Currently the roof water of the residence discharges to the kerb on Ruby Street and surface flows
generally discharge to the neighbouring property on the West. The shed at the rear and a rear portion of the
allotment currently drain to Opal Lane.

The lawful points of discharge for the site is the Ruby Street and Opal Lane Road Reserves.




                                              Ingeniir Pty Ltd | 215101-SMP-01
                ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                         Page 4 | 14

Used in these records

About this file

File size
2.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E - Stormwater Management Plan.pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.