Appendix 5. Geotechnical Engineering Report [As Published] · 132007.2399
Geo-environmental studies are commissioned to gain information about environmental conditions on and beneath the surface of a site. The more comprehensive the study, the more reliable the assessment is likely to be. But remember, any such assessment is to a greater or lesser extent based on professional opinions about conditions that cannot be seen or tested. Accordingly, no matter how much data is accumulated, risks created by unanticipated conditions will always remain. Have realistic expectations. Work with your Geo- environmental consultant to manage known and unknown risks. Part of that process should already have been accomplished, through the risk allocation provisions you and your Geo-environmental professional discussed and included in your contract's general terms and conditions. This document is intended to explain some of the concepts that may be included in your agreement, and to pass along information and suggestions to help you manage your risk. Beware of Change; Keep Your Geo- environmental Professional Advised The design of a Geo-environmental study considers a variety of factors that are subject to change. Changes can undermine the applicability of a report's findings, conclusions, and recommendations. Advise your Geo- environmental professional about any changes you become aware of them. Geo-environmental professionals cannot accept responsibility or liability for problems that occur because a report fails to consider conditions that did not exist when the study was designed. Ask your Geo-environmental professional about the types of changes you should be particularly alert to. Some of the most common include: e modification of the proposed development or ownership group, «sale or other property transfer, replacement of or additions to the financing entity, amendment of existing regulations or introduction of new ones, or changes in the use or condition of adjacent property Should you become aware of any change, do not rely on an existing Geo-environmental report. Advise your Geo-environmental professional immediately; follow the professional's advice. Recognize the Impact of Time A Geo-environmental professional's _ findings, recommendations, and conclusions cannot remain valid indefinitely. The more time that passes, the more likely it is that important latent changes may occur. Do not rely on a Geo-environmental report if too much time has elapsed since it was completed. Ask your environmental professional to define “too much time." In the case of Phase I Environmental Site Assessments (ESAs), for example, more than 180 days after submission is generally considered "too much." Prepare To Deal with Unanticipated Conditions The findings. recommendations, and conclusions of a Phase I ESA report typically are based on a review of historical information, interviews, a site “walkover,” and other forms of noninvasive research. When site subsurface conditions are not sampled in any way, the risk of unanticipated conditions is higher than it would otherwise be. While borings, installation of monitoring wells, and similar invasive test methods can help reduce the risk of unanticipated conditions, do not overvalue the effectiveness of testing. Testing provides information about actual conditions only at the precise locations where samples are taken, and only when they are taken. Your Geo-environmental professional has applied that specific information to develop a general opinion about environmental conditions. Actual conditions in areas not sampled may differ (sometimes sharply) from those predicted in a report. For example, a site may contain an unregistered underground storage tank that shows no surface trace of its existence. Even conditions in areas that were tested can change, sometimes suddenly, due to any number of events, not the least of which include occurrences at adjacent sites. Recognize, too, that even some conditions in tested areas may go undiscovered, because. the tests or analytical methods used were designed to detect only those conditions assumed to exist. Manage your risks by retaining your Geo-environmental professional to work with you as the project proceeds. Establish a contingency fund or other means to enable your Geo-environmental professional to respond rapidly, jn order to limit the impact of unforeseen conditions. To help prevent any misunderstanding, identify those Page 1 of 3 GAP - Form No.34 RL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix 5. Geotechnical Engineering Report [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.