Council archive · source document
Appendix 5. Geotechnical Engineering Report [As Published] · 132007.2399
empowered to authorize changes and the administrative procedures that should be followed. Do Not Permit Any Other Party To Rely on the Report Geo-environmental professionals design their studies and prepare their reports to meet the specific needs of the clients who retain them, in light of the risk management methods that the client and Geo-environmental professional agree to, and the statutory, regulatory, or other requirements that apply. The study designed for a ‘developer may differ sharply from one designed for a lender, insurer, public agency .. or even another developer. Unless the report specifically states otherwise, it was developed for you and only you. Do not unilaterally permit any other party to rely on it. The report and the study underlying it may not be adequate for another party's needs, and you could be held liable for shortcomings your Geo-environmental professional was powerless to prevent or anticipate. Inform your Geo-environmental professional when you know or expect that someone else - a third-party will want to use or rely on the report. Do not permit third-party use or reliance until you first confer with the Geo- environmental professional who prepared the report. Additional testing, analysis, or study may be required and, in any event, appropriate terms and conditions should be agreed to so both you and your Geo- environmental professional are protected from third- party risks. Any party who relies on a Geo- environmental report without the express written permission of the professional who prepared it and the client for whom it was prepared may be solely liable for any problems that arise. Avoid Misinterpretation of the Report Design professionals and other parties may want to rely on the report in developing plans and specifications. They need to be advised, in writing, that their needs may not have been considered when the study's scope was developed, and, even if their needs were considered, they might misinterpret Geo-environmental _ findings, conclusions, and recommendations. Commission your Geo-environmental professional to explain pertinent elements of the report to others who are permitted to rely on it, and to review any plans, specifications or other instruments of professional service that incorporate any of the report’s “findings, conclusions, or recommendations. Your Geo-environmental professional has the best understanding of the issues involved, including the fundamental assumptions that determined the study's scope. Give Contractors Access to the Report Reduce the risk of delays, claims, and disputes by giving contractors access to the full report, providing that it is accompanied by a letter of transmittal that can protect you by making it unquestionably clear that: 1) the study was not conducted and the report was not prepared for purposes of bid development, and 2) the findings, conclusions, and recommendations included in the report are based on a variety of opinions, inferences, and assumptions and are subject to interpretation. Use the letter to also advise contractors to consult with your Geo- environmental professional to obtain clarifications, interpretations, and guidance (a fee may be required for this service), and that-in any event-they should conduct additional studies to obtain the specific type and extent of information each prefers for preparing a bid or cost estimate. Providing access to the full report, with the appropriate caveats, helps prevent formation of adversarial attitudes and claims of concealed or differing conditions. If a contractor elects to ignore the warnings and advice in the-letter of transmittal, it would do so at its own risk. Your Geo-environmental professional should be able to help you prepare an effective letter. Do Not Separate Documentation from the Report Geo-environmental reports often include supplementary documentation, such as maps and copies of regulatory files, permits, registrations, citations, and correspondence with regulatory agencies. If subsurface explorations were performed, the report may contain final boring logs and copies of laboratory data. If remediation activities occurred on site, the report may include: copies of daily field reports, waste manifests, and information about the disturbance of subsurface materials, the type and thickness of any fill placed on site, and fill placement practices, among other types of documentation. Do not separate supplementary documentation from the report. Do not, and do not permit any other party to redraw or modify any of the supplementary documentation for incorporation into other professionals’ instruments of service. Understand the Role of Standards Unless they are incorporated into statutes or regulations, standard practices and standard guides developed by the American Society for Testing and Materials (ASTM) and other recognized standards-developing organizations (SDOs) are little more than aspirational methods agreed to by a consensus of a committee. The committees that develop standards may not comprise those best qualified to establish methods and, no matter what, no standard method can possibly consider the infinite client and project-specific variables that fly in the face of the theoretical “standard conditions" to which standard practices and standard guides apply. In fact, these variables can be so pronounced that Geo-environmental professionals who comply with every directive of an ASTM or other standard procedure could run foul of local custom and practice, thus violating the standard of care. Accordingly, when Geo-environmental professionals indicate in their reports that they have performed a service “in general compliance" with one standard or another, it means they have applied professional judgement in creating and implementing a scope of service designed for the specific client and project involved, and which follows some of the general precepts laid out in the referenced standard. To the Page 2 of 3 GAP —~ Form No. 34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix 5. Geotechnical Engineering Report [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.