Council archive · source document
Appendix 5. Geotechnical Engineering Report [As Published] · 132007.2399
extent that a report indicates "general compliance" with a standard, you may wish to speak with your Geo- environmental professional to learn more about what was and was not done. Do not assume a given standard was followed to the letter. Research indicates that that seldom is the case. Realize That Recommendations May Not Be Final The technical recommendations included in a Geo- environmental report are based on assumptions about actual conditions, and so are preliminary or tentative. Final recommendations can be prepared only by observing actual conditions as they are exposed. For that reason, you should retain your Geo-environmental professional to observe construction and/or remediation activities on site, to permit rapid response to unanticipated conditions. The Geo-environmental professional who prepared the report cannot assume responsibility or liability for the report’s recommendations if that professional is not retained to observe relevant site operations. Understand That Geotechnical Issues Have Not Been Addressed Unless geotechnical engineering was specifically included in the scope of professional service, a report is not likely to relate any findings, conclusions, or recommendations about the suitability of subsurface materials for construction purposes, especially when site remediation has been accomplished through the removal, replacement, encapsulation, or chemical treatment of on- site soils. The equipment, techniques, and testing used by geotechnical engineers differ markedly from those used by Geo-environmental professionals; _ their education, training, and experience are also significantly different. If you plan to build on the subject site, but have not yet had a geotechnical engineering study conducted, your Geo-environmental professional should be able to provide guidance about the next steps you should take. The same firm may provide the services you need. Read Responsibility Provisions Closely Geo-environmental studies cannot be exact; they are based on professional judgement and _ opinion. Nonetheless, some clients, contractors, and others assume Geo-environmental reports are or certainly should be unerringly precise. Such assumptions have created unrealistic expectations that have led to wholly unwarranted claims and disputes. To help prevent such problems, Geo-environmental professionals have developed a number of report provisions and contract terms that explain who is responsible for what, and how risks are to be allocated. Some people mistake these for "exculpatory clauses," that is, provisions whose purpose is to transfer one party's rightful responsibilities and liabilities to someone else. Read the responsibility provisions included in a report and in the contract you and your Geo-environmental professional agreed to. They are important. Rely on Your Geo-environmental Professional for Additional Assistance Membership in ASFE exposes Geo-environmental professionals to a wide array of risk management techniques that can be of genuine benefit for everyone involved with a Geo-environmental project. Confer with your ASFE-member Geo-environmental professional for more information. Page 3 of 3 GAP - Form No. 34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix 5. Geotechnical Engineering Report [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.