NOOSA COUNCIL IDAS Development Application Decision Notice                                                      9 of 16


              electricity meters removed and electrical wires disconnected; and

              telephone lines are disconnected; and

              high speed data cables and television provider boxes are disconnected and removed to the
              standard required by the regulatory authority;


68.    All building materials containing asbestos, including asbestos cement sheeting or roofing and lagging,
       must be removed from the building and disposed of in accordance with industry best practice.

69.    Waste generated during construction must be stockpiled in a centralised location and covered as required
       to prevent material being blown onto adjoining properties including the road reserve or food waste from
       generating vermin. All site waste must be disposed of to an approved waste disposal facility either directly
       or via an approved waste receptacle and collection service. Storage areas are to be located near the
       temporary access to the site so that access can be gained with out damage to infrastructure.

70.    All building materials containing asbestos products must be disposed on in accordance with industry best
       practice.

71.    A temporary crossing must be provided to protect road reserve infrastructure including kerb and channel;

72.    Any damage to footpaths, street plantings, kerb and channel or roadways at the removal site, the
       relocation site or between the sites must be repaired or reinstated to at least pre-existing conditions.

73.    Sediment and erosion control measures must be placed on site prior to the works commencing and shall
       be maintained until all works are complete. The erosion and sediment control measures shall be in
       accordance with the “Best practice guidelines for control of stormwater on building sites” prepared by
       Healthy Waterways (copy attached or available at www.healthywaterways.org).

74.    All disturbed areas must be revegetated or otherwise stabilised at the completion of the works. Disturbed
       areas are revegetated using species identified in PSP3 – Landscaping Plants and Guidelines.

75.    The transportation of all materials to and from the site must be undertaken in a manner such that no
       particle matter escapes onto a public road. All vehicles carrying out materials either to or from the site
       shall be covered to prevent materials including dust being windblown from the vehicle.

76.    A Waste Management Plan shall be submitted for the demolition to the Land Use Section of Noosa
       Council, prior to the development permit for building works being issued. The Plan shall contain the
       following information:-
       MATERIALS ON-SITE                              DESTINATION
                                                      Re-use and Recycling            Disposal
       Expected     waste    Estimated volume (m³)    On-site       *specify   Off-site   *specify   *Specify contractor
       materials                                      proposed   reuse or      contractor       &    & landfill site
                                                      onsite       recycling   recycling outlet
                                                      methods
       Excavation material
       Green waste
       Bricks
       Concrete
       Timber – please
       specify
       Plasterboard
       Metals – please
       specify
       Asbestos
       Other – please
       specify
      Note * Details of site area to be used for onsite separation, treatment and storage (including weather
      protection) shall be provided on the plan drawings accompanying your application. If a demolition
      contractor is undertaking works, then the Waste Management table is to be completed by the demolition
      contractor.
      The purpose of the Waste Management Plan is to facilitate the segregation of waste for the effective
      reuse and recycling of such materials. Additionally Council rewards those who segregate waste by
      significantly reducing disposal fees at the landfill some items are free. Higher gate fees are charged for
      loads of mixed waste.




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@980194be\@[email protected]

Used in these records

About this file

File size
157 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00001181.001 [As Published].pdf · 157 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.