Council archive · source document
IR - Duplex - Response to NC information request · MCU19/0119
Page 4 Item 8: Update the Stormwater Management Plan for the site to include details of (but not limited to): 11.1. any required Stormwater pipelines/flowpaths within the site to drain low areas on all adjoining properties to prevent additional stormwater ponding; and 11.2. shape, slope, lining, outlet, etc. of the swales shown on SCGs drawing No. 29175- SW1.1, “Stormwater Management”. Applicant’s Response to Item 8: Please refer to Attachment C for revised plans prepared by SCG Consulting Engineers. Item 9: Provide structural details for the proposed retaining walls. Applicant’s Response to Item 9: Please refer to Attachment C for revised plans prepared by SCG Consulting Engineers. The applicants consider that they have now responded to Council’s information request. Would you please provide us with a list of adjoining owners so we may commence public notification of the application. Please contact our Sunshine Coast office if you require any further information and/or clarification. Yours faithfully, Nadine Gorton Senior Planner martoo consulting pty ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
IR - Duplex - Response to NC information request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 389 KB (small file)
- File type
No other editions are linked here.