13. OBoat Hire - Prescribed Tidal Works Code
Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.
NOOSA RIVER ENTERPRISES PTY LTD AS TRUSTEE UNDER INSTRUMENT 708121382 – PRESCRIBED
TIDAL WORKS – OBOATS REDEVELOPMENT
Performance Criteria Acceptable Solution Comments
Infrastructure, including, access, parking, sewerage and water services
environments, having regard to their a) subject to paragraph (b), each The proposed structure will be
ability to resist the following:- Australian Standard relevant to constructed from materials with a
long life, resilient to marine
the materials that should be
a) attack by marine organisms; organisms, corrosion and salt water.
used, or the measures that
b) corrosion; The engineered plans show the
should be taken to treat materials used.
c) deterioration or breakage
materials used, for structures, to
resulting from exposure to
the extend the requirements
environmental conditions
stated in the Standard apply to
including, for example, the
structures located in a marine
following:-
environment;
(i) abrasion;
b) if a relevant planning scheme
(ii) immersion in
standard is more stringent than
seawater;
the standard mentioned in
(iii) wave action.
paragraph (a) – the relevant
planning scheme standard, to the
extent it is more stringent than
the standard mentioned in
paragraph (a).
12.5 Prescribed tidal works are The design and construction of the Not applicable.
designed and constructed in a way to prescribed tidal works is consistent
ensure they do not adversely affect with the following standards:-
the operation or maintenance of any
existing stormwater outlet. There are no existing stormwater
a) subject to paragraph (c), vessels
outlets in this location.
moored at prescribed tidal work
do not impede the discharge of
stormwater;
b) subject to paragraph (c),
prescribed tidal work does not
restrict access to any stormwater
outlet;
c) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph (a) – the relevant
planning scheme standard, to the
extent it is more stringent than
the standard mentioned in
paragraph (a) or (b).
12.6 Prescribed tidal works are The design and construction of the Compliant.
designed and constructed in a way to prescribed tidal works is consistent
ensure they do not adversely affect with the following standards:-
the water quality of any tidal water,
including, in particular, as a result of:- a) subject to paragraph (b), each The proposed structure will involve
only minimal and short lived
Australian Standard relevant to
disturbance to the bed during the
a) release, into the tidal water, of the design or construction of
removal of the old piles and
materials used in the structures under, within or over installation of the new piles. Should a
construction of the work; or tidal water, to the extent the sediment plume occur as a result of
b) disturbance to the sediment on requirements stated in the the piling activities and spread to
the bed and banks of the tidal Standard are directed at greater than 30m from the source,
water; or maintaining the water quality of work is to stop and action is taken to
c) exposure to acid sulphate soils. tidal water; reduce the plume from spreading.
See the original