NOOSA RIVER ENTERPRISES PTY LTD AS TRUSTEE UNDER INSTRUMENT 708121382 – PRESCRIBED
TIDAL WORKS – OBOATS REDEVELOPMENT
Performance Criteria                       Acceptable Solution                        Comments

Infrastructure, including, access, parking, sewerage and water services

     including for example, boulders,          the standard mentioned in
     concrete blocks or sandbags.              paragraph (a) or (b).
12.2 Prescribed tidal work does not       The design and construction of the          Compliant.
adversely affect the structural           prescribed tidal work is consistent
integrity of any existing revetment or    with the following standards:-
seawall or another existing structure.
                                          a)   subject    to   paragraph       (b),   All construction plans have been
                                                                                      signed by an RPEQ to be suitable in
                                               prescribed tidal works, including
                                                                                      this regard. Please refer to the design
                                               any shore abutment, piling or
                                                                                      report included in the application
                                               other structure connected with         documents.
                                               the work:-
                                               (i) does not place an additional
                                                    load    on any        existing
                                                    revetment or seawall or
                                                    another existing structure; or
                                               (ii) can      be       structurally
                                                    supported by an existing
                                                    revetment or seawall or
                                                    another existing structure;
                                          b) if a relevant planning scheme
                                               standard is more stringent than
                                               the standard mentioned in
                                               paragraph (a) – the relevant
                                               planning scheme standard, to the
                                               extent it is more stringent than
                                               the standard mentioned in
                                               paragraph (a).
12.3       Prescribed tidal work are      The design and construction of the          Compliant.
designed and constructed in a way to      prescribed tidal works is consistent
ensure it does not adversely affect the   with the following standards:-
stability of the bed and banks of any
tidal water.                              a)   subject    to   paragraph    (b),      The proposed structure will involve
                                                                                      only minimal disturbance to the
                                               prescribed tidal work does not
                                                                                      riverbed during the removal of the
                                               cause, by changing the flow of
                                                                                      existing piles and installation of the
                                               water, the removal of, or              new piles. The effects will be short
                                               disturbance to, the sediment on        term and will not affect the stability of
                                               the bed and banks of any tidal         the bed and banks of the tidal water
                                               water;                                 and this is certified in the engineer’s
                                          b) if a relevant planning scheme            design report.
                                               standard is more stringent than
                                               the standard mentioned in
                                               paragraph (a) – the relevant
                                               planning scheme standard, to the
                                               extent it is more stringent than
                                               the standard mentioned in
                                               paragraph (a).
12.4    Prescribed tidal works are        The design and construction of the          Compliant.
designed and constructed using            prescribed tidal works is consistent
materials   suitable   for  marine        with the following standards:-
Log in to download the original file

13. OBoat Hire - Prescribed Tidal Works Code.pdf · 289 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.