13. OBoat Hire - Prescribed Tidal Works Code
Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.
NOOSA RIVER ENTERPRISES PTY LTD AS TRUSTEE UNDER INSTRUMENT 708121382 – PRESCRIBED
TIDAL WORKS – OBOATS REDEVELOPMENT
Performance Criteria Acceptable Solution Comments
Infrastructure, including, access, parking, sewerage and water services
including for example, boulders, the standard mentioned in
concrete blocks or sandbags. paragraph (a) or (b).
12.2 Prescribed tidal work does not The design and construction of the Compliant.
adversely affect the structural prescribed tidal work is consistent
integrity of any existing revetment or with the following standards:-
seawall or another existing structure.
a) subject to paragraph (b), All construction plans have been
signed by an RPEQ to be suitable in
prescribed tidal works, including
this regard. Please refer to the design
any shore abutment, piling or
report included in the application
other structure connected with documents.
the work:-
(i) does not place an additional
load on any existing
revetment or seawall or
another existing structure; or
(ii) can be structurally
supported by an existing
revetment or seawall or
another existing structure;
b) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph (a) – the relevant
planning scheme standard, to the
extent it is more stringent than
the standard mentioned in
paragraph (a).
12.3 Prescribed tidal work are The design and construction of the Compliant.
designed and constructed in a way to prescribed tidal works is consistent
ensure it does not adversely affect the with the following standards:-
stability of the bed and banks of any
tidal water. a) subject to paragraph (b), The proposed structure will involve
only minimal disturbance to the
prescribed tidal work does not
riverbed during the removal of the
cause, by changing the flow of
existing piles and installation of the
water, the removal of, or new piles. The effects will be short
disturbance to, the sediment on term and will not affect the stability of
the bed and banks of any tidal the bed and banks of the tidal water
water; and this is certified in the engineer’s
b) if a relevant planning scheme design report.
standard is more stringent than
the standard mentioned in
paragraph (a) – the relevant
planning scheme standard, to the
extent it is more stringent than
the standard mentioned in
paragraph (a).
12.4 Prescribed tidal works are The design and construction of the Compliant.
designed and constructed using prescribed tidal works is consistent
materials suitable for marine with the following standards:-