Skip to the record
Accept no substitutions.

Original source · versioned page text

13. OBoat Hire - Prescribed Tidal Works Code

Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.

of 27

Page text shows just the words. Original shows the document exactly as it was published.

NOOSA RIVER ENTERPRISES PTY LTD AS TRUSTEE UNDER INSTRUMENT 708121382 – PRESCRIBED
TIDAL WORKS – OBOATS REDEVELOPMENT
Performance Criteria                     Acceptable Solution                        Comments

Design, construction and safety – prescribed decks

having regard to its relevant loading    (a) subject to paragraph (b), each of
matters.                                      the        following     Australian
                                              Standards        to  the    extent
                                              requirements stated in the
                                              Standard apply to relevant
                                              loading matters for the design or
                                              construction of the prescribed
                                              deck:-
                                                   (i)        AS/NZS 1170.0;
                                                   (ii)       AS/NZS 1170.1;
                                                   (iii)      AS/NZS 1170.2;
                                                   (iv)       AS 4997;
                                         (b) if a relevant planning scheme
                                              standard is more stringent than
                                              the standard in paragraph (a), (b)
                                              or (c) – the relevant planning
                                              scheme standard, to the extent it
                                              is more stringent than the
                                              standard in paragraph (a), (b) or
                                              (c).
15.2 Prescribed tidal works that are a   (s 5(2) outcome)                           Not applicable.
prescribed deck and for a non-private
purpose     are     designed      and    The design and construction of the
constructed in a way to ensure it is     prescribed deck is consistent with the
able to support its intended loads,      following standards:-                      The proposed works        is   not   a
having regard to its relevant loading                                               prescribed deck.
matters.                                 (a) subject to paragraph (b), each of
                                              the     following       Australian
                                              Standards     to    the      extent
                                              requirements stated in the
                                              Standard apply to relevant
                                              loading matters for the design or
                                              construction of the prescribed
                                              deck:-
                                             (i)   AS/NZS 1170.0;
                                             (ii) AS/NZS 1170.1;
                                             (iii) AS/NZS 1170.2;
                                             (iv) AS 4997;
                                         (b) if a relevant planning scheme
                                              standard is more stringent than
                                              the standard in paragraph (a) –
                                              the relevant planning scheme
                                              standard, to the extent it is more
                                              stringent than the standard in
                                              paragraph (a).
15.3 Prescribed tidal work that is a     The design and construction of the         Not applicable.
prescribed deck do not prevent or        boardwalk or deck is consistent with
hinder    remedial    work      being    the following standards:-
undertaken on any bank of tidal water
or for any existing retaining wall,                                                 The proposal is not a prescribed deck.
Log in to download the original file

13. OBoat Hire - Prescribed Tidal Works Code.pdf · 289 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.