Original source · versioned page text
13. OBoat Hire - Prescribed Tidal Works Code
Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.
NOOSA RIVER ENTERPRISES PTY LTD AS TRUSTEE UNDER INSTRUMENT 708121382 – PRESCRIBED
TIDAL WORKS – OBOATS REDEVELOPMENT
Performance Criteria Acceptable Solution Comments
Design, construction and safety – prescribed decks
having regard to its relevant loading (a) subject to paragraph (b), each of
matters. the following Australian
Standards to the extent
requirements stated in the
Standard apply to relevant
loading matters for the design or
construction of the prescribed
deck:-
(i) AS/NZS 1170.0;
(ii) AS/NZS 1170.1;
(iii) AS/NZS 1170.2;
(iv) AS 4997;
(b) if a relevant planning scheme
standard is more stringent than
the standard in paragraph (a), (b)
or (c) – the relevant planning
scheme standard, to the extent it
is more stringent than the
standard in paragraph (a), (b) or
(c).
15.2 Prescribed tidal works that are a (s 5(2) outcome) Not applicable.
prescribed deck and for a non-private
purpose are designed and The design and construction of the
constructed in a way to ensure it is prescribed deck is consistent with the
able to support its intended loads, following standards:- The proposed works is not a
having regard to its relevant loading prescribed deck.
matters. (a) subject to paragraph (b), each of
the following Australian
Standards to the extent
requirements stated in the
Standard apply to relevant
loading matters for the design or
construction of the prescribed
deck:-
(i) AS/NZS 1170.0;
(ii) AS/NZS 1170.1;
(iii) AS/NZS 1170.2;
(iv) AS 4997;
(b) if a relevant planning scheme
standard is more stringent than
the standard in paragraph (a) –
the relevant planning scheme
standard, to the extent it is more
stringent than the standard in
paragraph (a).
15.3 Prescribed tidal work that is a The design and construction of the Not applicable.
prescribed deck do not prevent or boardwalk or deck is consistent with
hinder remedial work being the following standards:-
undertaken on any bank of tidal water
or for any existing retaining wall, The proposal is not a prescribed deck.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.