NOOSA RIVER ENTERPRISES PTY LTD AS TRUSTEE UNDER INSTRUMENT 708121382 – PRESCRIBED
TIDAL WORKS – OBOATS REDEVELOPMENT


 Performance Criteria                       Acceptable Solution                       Comments

 Design, construction and safety – bridges

 14.1 Prescribed tidal works that are       The design and construction of the        Not applicable.
 a bridge do not adversely affect           bridge is consistent with:
 existing public use of any tidal water,
 including, for example, use of the tidal   a)  subject to paragraph (b), the
 water for canoeing, swimming or                                                      The proposal is not a bridge.
                                                clearance levels under a bridge
 other recreational activities.                 are high enough to allow
                                                continued public use of any tidal
                                                water     over    which     it   is
                                                constructed;
                                            b) if a relevant planning scheme
                                                standard is more stringent than
                                                the standard in paragraph (a) –
                                                the relevant planning scheme
                                                standard, to the extent it is more
                                                stringent than the standard in
                                                paragraph (a).
 4.2 Prescribed tidal works that are a      The design and construction of the        Not applicable.
 bridge do not adversely affect the         bridge is consistent with:-
 flow of water under the bridge.
                                            a)  subject to paragraph (b) –
                                                                                      The proposal is not a bridge.
                                               (i)   if a bridge can be
                                                     adequately          supported
                                                     without erecting or placing
                                                     a foundation support in
                                                     tidal water – no foundation
                                                     support to support the
                                                     bridge is erected or placed
                                                     in the tidal water; or
                                               (ii) otherwise – only the
                                                     minimum        number      of
                                                     foundation           supports
                                                     required to support the
                                                     bridge is used;
                                            b) if a relevant planning scheme
                                                standard is more stringent than
                                                the standard in paragraph (a) –
                                                the relevant planning scheme
                                                standard, to the extent it is more
                                                stringent than the standard in
                                                paragraph (a).

Performance Criteria                        Acceptable Solution                       Comments

Design, construction and safety – prescribed decks

15.1 Prescribed tidal works that are a      (s 5(2) outcome)                          Not applicable.
prescribed deck and for a private
purpose     are     designed      and       The design and construction of the
constructed in a way to ensure it is        prescribed deck is consistent with:-
able to support its intended loads,                                                   The proposal is not a prescribed deck.
Log in to download the original file

13. OBoat Hire - Prescribed Tidal Works Code.pdf · 289 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.