Performance Criteria Acceptable Solution Comments
Design, construction and safety – bridges
14.1 Prescribed tidal works that are The design and construction of the Not applicable.
a bridge do not adversely affect bridge is consistent with:
existing public use of any tidal water,
including, for example, use of the tidal a) subject to paragraph (b), the
water for canoeing, swimming or The proposal is not a bridge.
clearance levels under a bridge
other recreational activities. are high enough to allow
continued public use of any tidal
water over which it is
constructed;
b) if a relevant planning scheme
standard is more stringent than
the standard in paragraph (a) –
the relevant planning scheme
standard, to the extent it is more
stringent than the standard in
paragraph (a).
4.2 Prescribed tidal works that are a The design and construction of the Not applicable.
bridge do not adversely affect the bridge is consistent with:-
flow of water under the bridge.
a) subject to paragraph (b) –
The proposal is not a bridge.
(i) if a bridge can be
adequately supported
without erecting or placing
a foundation support in
tidal water – no foundation
support to support the
bridge is erected or placed
in the tidal water; or
(ii) otherwise – only the
minimum number of
foundation supports
required to support the
bridge is used;
b) if a relevant planning scheme
standard is more stringent than
the standard in paragraph (a) –
the relevant planning scheme
standard, to the extent it is more
stringent than the standard in
paragraph (a).
Performance Criteria Acceptable Solution Comments
Design, construction and safety – prescribed decks
15.1 Prescribed tidal works that are a (s 5(2) outcome) Not applicable.
prescribed deck and for a private
purpose are designed and The design and construction of the
constructed in a way to ensure it is prescribed deck is consistent with:-
able to support its intended loads, The proposal is not a prescribed deck.