13. OBoat Hire - Prescribed Tidal Works Code

Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.

of 27

Page text shows just the words. Original shows the document exactly as it was published.

NOOSA RIVER ENTERPRISES PTY LTD AS TRUSTEE UNDER INSTRUMENT 708121382 – PRESCRIBED
TIDAL WORKS – OBOATS REDEVELOPMENT
Performance Criteria                      Acceptable Solution                       Comments

Design, construction and safety – pontoons

                                          c)   if a planning scheme standard is
                                               more stringent than the standard
                                               mentioned in paragraph (a) or
                                               (b)– the planning scheme
                                               standard, to the extent it is more
                                               stringent than the standard
                                               mentioned in paragraph (a) or
                                               (b).
18.5 Prescribed tidal works that are a    The design and construction of the        Compliant.
pontoon identifies the lot to which       pontoon is consistent with the
the pontoon is connected.                 following standards:-

                                          a)   a label that identifies the lot to   A label identifying each pontoon
                                                                                    finger component to the lot will be
                                               which the pontoon is connected
                                                                                    fixed to the top surface of each
                                               is written or stamped on, or fixed
                                                                                    pontoon flotation unit.
                                               to, the outside of the pontoon’s
                                               floatation unit;
                                          b) if a relevant planning scheme
                                               standard is more stringent than
                                               the standard mentioned in
                                               paragraph a) – the relevant
                                               planning scheme standard to the
                                               extent it is more stringent than
                                               the standard mentioned in
                                               paragraph a).
18.6 Prescribed tidal works that are a    (s 5(2) outcome)                          Not applicable.
pontoon permanently used for the
fueling of, or the storage of fuel for,   The design and construction of the
vessels are designed and constructed      pontoon is consistent with the
in a way to ensure:-                      following standards:-                     The proposed redevelopment does
                                                                                    not involve any changes to the
(a) the pontoon is able to support its    (a) subject to paragraph (c), each of     existing fuel facility. The centre access
intended loads, having regard to its          the      following       Australian   walkway housing all fuel lines and
relevant loading matters; and                                                       supporting the existing fuel bowser
                                              Standards      to    the    extent
                                                                                    will remain in place.
                                              requirements stated in the
(b) the pontoon is safe for persons
using the pontoon.                            Standard apply to relevant
                                              loading matters for the design or
                                              construction of the pontoon:-
                                              (i) AS/NZS 1170.0;
                                              (ii) AS/NZS 1170.1;
                                              (iii) AS/NZS 1170.2;
                                              (iv) AS1170.4
                                              (v) AS 4997;
                                          (b) Subject to paragraph (c), AS 3962
                                              to the extent requirements stated
                                              in the Standard apply to a
                                              pontoon permanently used for
                                              the fueling of, or the storage of
                                              fuel;
                                          (c) if a relevant planning scheme
                                              standard is more stringent than
Log in to download the original file

13. OBoat Hire - Prescribed Tidal Works Code.pdf · 289 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.